Laserfiche WebLink
MR181 10/26/2001 <br />MR182 3/26/2002 <br />MR183 6/14/2002 <br />MR184 7/29/2002 <br />MR185 7/26/2002 <br />MR186 9/25/2002 <br />MR187 11/07/2002 <br />MR188 3/28/2003 <br />MR189 6/10/2003 <br />Technical Revisions: <br />Officers and Directors Update <br />Update F, G and Z Pit Mining Limits <br />SPCC Plan Update <br />Mine Plan Update for F and G Pits <br />Clarification of Shrub Clump Standard <br />Relocate Ammonium Nitrate and Emulsion Silos <br />Relocation of Explosives Magazine <br />Retention of Permanent Diversion Ditches <br />Mine Plan Update <br />Revision No. Approval date Nature of revision <br /> <br />TR78 6/30/1999 Annual Report <br />TR79 9/21/1998 Middle Flume Gulch Sediment Ponds <br />TR80 11/06/1998 Horse Gulch Sediment Ponds <br />TR81 8/31/1999 Annual Report <br />TR82 7/16/1999 East Middle Flume Gulch Sediment Ponds <br />TR83 4/13/2000 1999 Annual Report <br />TR84 10/23/2000 Update of PHC <br />TR85 7/17/2000 East Flume Gulch Sediment Pond <br />TR86 12/05/2000 West Horse Gulch Pond & A-Pit Haulroad <br />TR87 3/05/2001 Midterm Reponses <br />TR88 5/22/2001 2000 Annual Report <br />TR89 12/14/2001 Discontinue Fertilization in Rangelands <br />TR90 6/13/2002 2001 Annual Report <br />TR91 5/20/2003 2002 Annual Report <br />Bond Release <br />The Division approved a bond liability release (SL-Ol) on 2,511.7 acres of the Trapper permit <br />azea on February 12, 1998. This was a Phase I release of liability for backfilling, grading, and <br />drainage reestablishment. It was Trapper's first bond release. A Phase II bond release (SL-02) <br />covering 1570.5 acres of the Phase I release was approved December 20, 1999. DMG approved <br />a partial Phase II bond release , SL03, on 592.7 acres of cropland April 19, 2002. SL03 was a <br />release of reclamation liability and no monies were returned to the operator. <br />The Division is currently reviewing a partial Phase III bond release request, SL04, for 1861.2 <br />acres of areas reclaimed to rangeland and cropland. The Division conducted a bond release <br />inspection on June 4, 2003. <br />Trapper Mine 8 June 30, 2003 <br />