My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53573
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:04 PM
Creation date
11/23/2007 8:44:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
6/8/1994
Doc Name
MEMO CRESSON PROJECT CONSTRUCTION INSPECTION MILESTONES
From
GOLDER ASSOCIATES
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />June 3, 1994 <br /> <br />3 <br />943-2720.010 <br />SUIVIIVIARY OF COMIVVIENTS FROM HARRY POSEY: <br />Ironclad Material: <br />Prior to placement of the clay liner beneath the pad, test results demonstrating cyanide <br />detoxification must be approved by the Office prior to material placement. <br />Representative liner samples analyzed for WAD and Total Cyanide and Metals <br />leachability tests. Interpretive report submitted to the Office for approval prior to <br />placement of the material. <br />Prior to commencement of the rinsing operation, CC&VG must submit a plan for dealing <br />with the rinse solutions. Note: "Rinsing" of the Ironclad tailings is not proposed, rather <br />the tailings will be amended with Calcium Hypochlorite. <br />Geochemical Analysis of the Pit Floor: <br />Prior to the commencement of mining in the sulfide bearing areas, geochemical analyses <br />of the pit floor must be completed and an interpretation report submitted to the Division <br />for approval prior to mining. <br />Completion of Lone-Term Leaching Tests: <br />Prior to placement of ore or waste rock, CC&VG must complete the long-term leaching <br />tests of ore and waste rocks and provide an interpretative report to the Division. The <br />report must be approved by the Division prior to placement of ore and waste rocks. <br />SUMMARY OF COMMENTS FROM ALLEN SORENSON: <br />Items that will be inspected one time during construction: <br />- Leachate collection riser pipes; and, <br />- Vibrating wire piezometers. <br />Items that will be inspected several times during construction: <br />- Tce fill berm foundation area; <br />- Leach facility foundation preparation; <br />- Underdrain installation and material testing documentation; <br />- Leak detection trenches and sumps; <br />- Tce berm fill; <br />- Soil liner fill; <br />
The URL can be used to link to this page
Your browser does not support the video tag.