Laserfiche WebLink
PERFORMANCE BOND AND LABOR AND MATERIALS PAYMENT BOND <br />A performance bond and a labor and materials payment bond are required for <br />this job. Please see the "General Conditions" Number 6. <br />THREE-WAY AGREEMENT AND INSURANCE <br />A three-way "Agreement for Reclamation Activities" is not required for this <br />job. Please see Number 5 of the "General Conditions" for the applicable <br />insurance requirements. <br />LIST OF EQUIPMENT OFFERED <br />The List of Equipment Offered form must be returned with each bid. All <br />equipment to be used on the project must be listed. The CONTRACTOR must own, <br />have a current lease for the equipment intended to be used to perform the <br />work, or must furnish a statement of arrangements to rent, or otherwise <br />procure, adequate equipment to perform the work. Inclusion of a piece of <br />equipment on the List of Equipment Offered represents a commitment to devote <br />that piece of equipment to the project work for the entire duration of the <br />project. If several contractors propose to join together to perform the work <br />under this purchase order contract, equipmen+r~owned or controlled by each <br />should be listed and the owner identified. A purchase order contract will not <br />be awarded to a bidder who in the opinion of the OWNER (a> does not have <br />adequate equipment, or (b) does not have firm and satisfactory arrangements to <br />obtain adequate equipment to perform the work described in the Invitation and <br />Bid. <br />PROJECT FUNDING <br />This project is funded 100`e with money made available to the State of Colorado <br />from revocation of bond monies retained by the Division of Minerals and <br />Geology for reclamation of this previously-permitted mining operation. <br />PROJECT WORK DESCRIPTION <br />BID ITEM l: MOBILIZATION/DEMOBILIZATION <br />Please see the General Bid Specifications, 1992. <br />BID ITEM 2: SAFEGUARD ADITS, BULKHEAD SEAL <br />The two existing adits will be sealed with triple wythe bulkhead seals. Seals <br />will be constructed at a minimum depth of ten feet (10)' into the mine <br />opening. Bulkheads will be keyed into the adits a minimum of twelve inches <br />(12") deep. Seals will tie into existing beams and timbers at their <br />constructed location. Please refer to the Bulkhead Seal Construction <br />Specifications in the General Bid Specifications, 1992. Seals will follow the <br />double wythe specification utilizing three courses of block in width instead <br />of two. <br />-3- <br />