Laserfiche WebLink
GENERAL BID SPECIFICATIONS <br />The Colorado Inactive Mine Reclamation Program General Bid Specifications <br />1992, which include General Conditions, Standard Work Specifications, and <br />Standard Drawings and Figures are intended to complement these Special <br />Conditions. The Special Conditions combined with the General Bid <br />Specifications 1992 form the complete Invitation and Bid document. Please <br />refer to the Standard Work Specifications for all applicable types of work <br />required in the Special Conditions. The General Conditions apply to all work <br />covered in the Special Conditions. Copies of the General Bid Specifications <br />are available at the Pre-Bid Meeting or from the Colorado Mined Land <br />Reclamation Division, 1313 Sherman Street, Room 215, Denver, Colorado 80203 <br />(303) 866-3567. <br />PROJECT START <br />The project is scheduled with a startup date for October 12, 1992. If a <br />contractor cannot schedule construction during this period, please do not bid <br />on this project. A Notice of Award will be sent to the apparent low bidder <br />within four <4) days of the bid opening. The Mined Land Reclamation Division <br />must receive the required insurance, bonds and project schedule within <br />fourteen (14) days after the bid opening. At the expiration of the fourteen <br />days CLMRD may elect to award the contract to the next lowest bidder. Bidders <br />are advised to keep close contact with CMLRD during this period. <br />PROJECT SCHEDULE AND PRE-CONSTRUCTION REQUIREMENTS <br />The project is scheduled for construction between October 12 and <br />November 11, 1992. A schedule of work items to be completed within this time <br />period must be submitted to the PROJECT MANAGER for approval prior to the <br />start of construction. The project schedule shall show Time Lines of major <br />activities and Bid items, and shall demonstrate the CONTRACTORS ability to <br />complete the project within the allotted time. <br />TIME OF COMPLETION <br />The time of completion allowed for the project is 30 calendar days after <br />receipt of the Notice to Proceed. <br />LIQUIDATED DAMAGES <br />The liquidated damages for this project will be $300.00 per day. Please see <br />"General Conditions", Numbers 9 and 10. <br />BID BOND <br />A bid bond is required for this job. Please see the "General Conditions" <br />Number 4. <br />-2- <br />