My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53111
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:46 PM
Creation date
11/23/2007 8:20:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
6/8/1984
Doc Name
FORMAL HEARING FINDINGS OF FACT AND DECISION
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• _5_ • <br />14. TO ENSURE PROTECTION OF GOLDEN EAGLE NESTS, NO SURFACE DISTURBANCE <br />WILL OCCUR FROM JANUARY 15 TO JULY 15 IN THE FOLLOWING AREAS: <br />T5N, R91W NW1/4 OF SECTION 8 <br />T6N, R92W SW1/4 OF SECTION 36 WITHIN THE PERMIT AREA <br />NE1/4 OF SECTION 36 <br />Sl/2 NW1/4 OF SECTION 36 <br />SE1/4 OF SECTION 35 WITHIN THE PERMIT AREA <br />SE1/4 OF SECTION 25 <br />15. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO SUBMIT A REVISION <br />REQUEST FOR THE DAYLIGHTING OF A VENTILATION PORTAL WITHIN THE <br />2-WEST AREA OF THE EAGLE N0. 5 MINE PRIOR TO MINING APPROACHING <br />CLOSER THAN T00' 70 THE SURFACE. THE DIVISION CANNOT DETERMINE THE <br />SIGNIFICANCE OF SUCH AN OPERATIONAL REVISION PRIOR TO ITS <br />SUBMITTAL, BECAUSE THE NATURE OF THE ENVIRONMENTAL AND MINE PLAN <br />IMPACTS ARE DEPENDENT UPON SITE-SPECIFIC ELEMENTS OF THE SPECIFIC <br />PROPOSED REVISION. FURTHER, THE OPERATOR SHALL NOT PROCEED CLOSER <br />THAN 100' TO THE SURFACE UNTIL A REVISION APPROVAL HAS BEEN GRANTED <br />BY THE DIVISION. <br />16. IN ORDER TO VERIFY THE ACCURACY OF THE POST-MINING TOPOGRAPHY AND <br />THE VOLUMETRICS PRESENTED ON TABLE IV-4b, THE DIVISION DIRECTS <br />EMPIRE ENERGY CORPORATION TO SUBMIT A DEMONSTRATION THAT THE <br />METHODOLOGY USED TO DETERMINE THE RECLAIMED CONFIGURATION IS IN <br />COMPLIANCE WITH RULE 4.14. THIS DEMONSTRATION SHALL BE SUBMITTED <br />WITHIN 45 DAYS OF PERMIT ISSUANCE. <br />17. IN ORDER TO CONFIRM THAT THE PROPOSED POST-MINING CONFIGURATION HAS <br />BEEN ACHIEVED, THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO <br />PROVIDE AN ANALYSIS OF THE POST-MINING SURFACE UTILIZING <br />APPROPRIATE SURVEYING TECHNIQUES PRIOR TO TOPSOIL REAPPLICATION <br />AND/OR kEVEGETATION. <br />18. WITHIN 120 DAYS OF PERMIT ISSUANCE, THE DIVISION DIRECTS EMPIRE <br />ENERGY CORPORATION TO IDENTIFY ALL RE-CREATED DRAINAGES ASSOCIATED <br />WITH THE PROPOSED POST-MINING TOPOGRAPHY. THE APPLICANT SHALL <br />PROVIDE PLANS, A DISCUSSION OF THE CONSTRUCTION AND A DEMONSTRATION <br />BASED ON THE RE-ESTABLISHED GRADE THAT THE DRAINAGE WILL BE <br />GEOMORPHICALLY STABLE. <br />19. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO AMEND MAP IV-2 TO <br />DEPICT THE EXISTING AND PROPOSED BOUNDARIES OF THE COAL PROCESSING <br />WASTE PILE AT THE EAGLE N0. 5 AND N0. 9 MINE COMPLEX. AMENDMENT OF <br />MAP IV-2 SHALL BE COMPLETED IN ACCEPTABLE FORM NO LATER THAN 30 <br />DAYS FOLLOWING ISSUANCE OF THE PERMIT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.