Laserfiche WebLink
• _fi_ • <br />21. GIVEN THE FACT THAT A SUFFICIENT HYDROSTATIC HEAD MAY BUILD UP <br />WITHIN THE COMPLETED EAGLE N0. 5 MINE WORKINGS TO CAUSE MINE WATER <br />DISCHARGES, THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO <br />PROJECT THE! HYDRAULIC HEAD WITHIN THE MINE AND DEVELOP A PLAN TO <br />SEAL MINE OPENINGS TO PREVENT DRAINAGE OF MINE WORKINGS TO THE <br />SURFACE. THIS PLAN MUST SHOW THAT THE WORKINGS WILL BE ABLE TO <br />WITHSTAND THE EXPECTED HYDROSTATIC HEAD DEVELOPED WITHIN THE EAGLE <br />N0. 5 MINE WORKINGS. THIS PLAN SHALL BE SUBMITTED TO THE DIVISION <br />WITHIN ONE YEAR OF PERMIT ISSUANCE. <br />22. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO MONITOR THE <br />ELEVATION AND ORIENTATION OF ALL RESIDENCES EXISTING WITHIN EMPIRE <br />VILLAGE AND THE PRIVATE RESIDENCE LOCATED WITHIN THE NE 1/4 of the <br />SE 1/4 OF SECTION 30 OF T6N, R91W. THIS SURVEY MONITORING SHALL BE <br />COMPLETED QUARTERLY AND THE RESULTS INCLUDED WITHIN THE SEMI-ANNUAL <br />SUBSIDENCE MONITORING REPORT, TO BE SUBMITTED IN ACCORDANCE WITH <br />RULE 2.05.6(6)(c)(i)(E). <br />23. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO SUBMIT AN AMENDED <br />SUBSIDENCE REPORT FORMAT, FOR USE IN COMPLETING THE REQUIRED <br />SEMI-ANNUAL SUBSIDENCE MONITORING REPORTS, AS REQUIRED BY RULE <br />2.05.6(6)(c)(i)(E). IN ADDITION TO THE SURVEY DATA SHEETS AND MAPS <br />THE AMENDED FORMAT SHALL INCLUDE, AT A MINIMUM: (1) <br />CROSS-SECTIONAL PLOTS PROJECTED ALONG THE LABELED MONUMENT SERIES <br />SECTION LINES; AND (2) NARRATIVE REPORTS COMPARING THE OBSERVED <br />SUBSIDENCE OCCURRENCE WITH THE PROJECTIONS CONTAINED WITHIN THE <br />PERMIT APPLICATION. THE CROSS-SECTIONAL PLOT SHALL BE CUMULATIVE, <br />IN ORDER TO ALLOW READY COMPARISON OF SUBSEQUENT DATA OF <br />UNDERGROUND WORKINGS RELATIVE TO THE LOCATION OF MONITORED <br />MONUMENTS. THIS REQUIRED AMENDED SUBSIDENCE MONITORING REPORT <br />FORMAT SHALL BE SUBMITTED TO THE DIVISION FOR REVIEW WITHIN 60 DAYS <br />OF PERMIT ISSUANCE. <br />24. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO SUPPLEMENT THE <br />PROPOSED SUBSIDENCE MONITORING PROGRAM FOR STATE HIGHWAY 13. <br />EMPIRE ENERGY CORPORATION IS DIRECTED TO CONDUCT DAILY VISUAL <br />INSPECTIONS OF STATE HIGHWAY 13 AND COUNTY ROAD N0. 107, FOR THE <br />PURPOSE OF IDENTIFYING AND BARRICADING ANY SUBSIDENCE OCCURRENCE <br />WHICH MIGHT ENDANGER THE HEALTH AND SAFETY OF THE PUBLIC OR <br />EMPLOYEES USING THESE PUBLIC THOROUGHFARES. <br />/ep <br />Doc. No. 1735 <br />