Laserfiche WebLink
• _4_ • <br />8. IN ACCORDANCE WITH RULE 2.05.3(2)(b), PRIOR TO ANY ADDITIONAL <br />PROPOSED SURFACE DISTURBANCES THE APPLICANT SHALL PROVIDE <br />APPROPRIATE MAPS PREPARED IN SUFFICIENT DETAIL TO DESCRIBE ALL <br />PROPOSED SURFACE DISTURBANCES TO BE ASSOCIATED WITH THE UNDERGROUND <br />MINING ACTIVITIES WITHIN THE PERMIT AREA. ANY ROADS PROPOSED TO BE <br />CONSTRUCTED AFTER THE APPROVAL OF THIS PERMIT WILL BE SUBJECT TO A <br />REVISION AND THE DIVISION SHALL BE NOTIFIED SO THE APPLICANT CAN BE <br />INFORMED AS TO THE NEED FOR TOPSOIL REMOVAL. <br />PRIOR TO ANY SURFACE DISTURBANCE BY HEAVY EQUIPMENT DURING <br />MAINTENANCE OR CONSTRUCTION ACTIVITIES, SUCH AS THOSE DISCUSSED ON <br />PAGE IV-60 OF THE APPLICATION, THE APPLICANT SHALL NOTIFY THE <br />DIVISION SO THE DIVISION CAN DETERMINE THE NEED FOR TOPSOIL REMOVAL. <br />9. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO PROVIDE FIVE (5) <br />YEARS WORTH OF CROP PRODUCTION DATA FOR THE CROPLANDS AND HAYFIELDS <br />TO SERVE AS THE REVEGETATION SUCCESS STANDARD. THE DATA SHALL BE <br />SUBMITTED TO THE DIVISION AND INCORPORATED INTO THE PERMIT <br />APPLICATION BY DECEMBER 15, OF EACH YEAR. <br />10. WITHIN 90 DAYS OF PERMIT ISSUANCE THE DIVISION DIRECTS EMPIRE <br />ENERGY CORPORATION TO SUBMIT REVEGETATION SUCCESS STANDARDS, <br />PURSUANT TO RULE 4.15.10, FOR PREVIOUSLY MINED AREAS: THE NO. 5A <br />PORTAL AREA, PONDS 5A-P2 and 3, THE OLD SHOP, THE TEMPORARY OFFICE <br />AND THE CRUSHER SITE. STANDARDS SHALL NOT BE LESS THAN THE MINIMUM <br />GROUND COVER EXISTING BEFORE REDISTURBANCE, AND SHALL BE ADEQUATE <br />TO CONTROL EROSION. <br />11. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO DEVELOP ADEQUATE <br />REVEGETATION SUCCESS STANDARDS FOR THE N0. 5 PORTAL AREA AND THE <br />COAL PROCESSING WASTE PILE PURSUANT TO RULE 4.15.7. STANDARDS FOR <br />COVER, PRODUCTION, WOODY PLANT DENSITY AND SPECIES DIVERSITY SHALL <br />BE INCORPORATED INTO THE PERMIT APPLICATION WITHIN 90 DAYS OF <br />PERMIT ISSUANCE. <br />12. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO PLACE FOUR FEET <br />OF NON-TOXIC, NON-ACIDIC AND NON-ALKALINE MATERIAL ON THE COAL <br />PROCESSING WASTE PILE UNTIL SUCH TIME AS EMPIRE ENERGY CORPORATION <br />SATISFACTORILY DEMONSTRATES TO THE DIVISION THAT THE REVEGETATION <br />REQUIREMENTS OF RULE 4.15 CAN BE ACHIEVED USING LESS THAN FOUR FEET <br />OF NON-TOXIC COVER. <br />13. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO SUBMIT A <br />REVEGETATION MONITORING PLAN PURSUANT TO RULE 4.15.1(4) WITHIN 30 <br />DAYS OF PERMIT ISSUANCE. <br />