My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53111
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:46 PM
Creation date
11/23/2007 8:20:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
6/8/1984
Doc Name
FORMAL HEARING FINDINGS OF FACT AND DECISION
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_3_ • <br />E) DESCRIPTION OF OBSERVED CHANGES OR FLUCTUATIONS IN GROUND WATER <br />LEVELS, MINE WATER DISCHARGES, AND IN SURFACE WATER FLOWS; <br />F) DESCRIPTION OF OBSERVED MINING-RELATED IMPACTS TO GROUND AND <br />SURFACE WATERS; <br />G) DESCRIPTION OF THOSE MEASURES UNDERTAKEN TO MINIMIZE GROUND AND <br />SURFACE WATER IMPACTS DURING THE YEAR; <br />H) PROJECTION OF POSSIBLE HYDROLOGIC IMPACTS OF MINING IN THE <br />UPCOMING YEAR; AND <br />I) DESCRIPTION OF MEASURES WHICH WILL BE UNDERTAKEN TO MINIMIZE <br />THESE PROJECTED HYDROLOGIC IMPACTS, SHOULD THEY OCCUR. <br />6. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION, WITHIN 90 DAYS OF <br />PERMIT ISSUANCE, TO SUBMIT TO THE DIVISION THE RESULTS OF A <br />SAMPLING PROGRAM FOR ALL OVERBURDEN PROPOSED TO BE USED FOR PLANT <br />GROWTH MEDIA. THE SAMPLING PLAN SHALL BE AS FOLLOWS: <br />THE SPATIAL SAMPLING REQUIREMENTS WILL BE BASED UPON THE AREA TO BE <br />SAMPLED. FOR SITES LESS THAN FIVE ACRES IN AREA, TWO RANDOM <br />SAMPLES WILL BE OBTAINED. FOR AREAS GREATER THAN FIVE ACRES, FOUR <br />RANDOM SAMPLES WILL BE OBTAINED. ALL SAMPLES SHALL BE TAKEN TO A <br />DEPTH OF THREE FEET. ONCE THE SAMPLE IS TAKEN, IT SHALL BE DIVIDED <br />EVERY SIX INCHES AND THESE SIX INCH INCREMENTS SAMPLED FOR THE <br />FOLLOWING PARAMETERS: <br />PH SAR* <br />EC SATURATION PERCENTAGE <br />TEXTURE ORGANIC MATTER <br />PARTICLE SIZE PLANT AVAILABLE POTASSIUM AND <br />NITRATE NITROGEN PHOSPHORUS <br />*WILL INCLUDE REPORTING CALCIUM, MAGNESIUM, AND SODIUM VALUES. <br />IN THE EVENT THE pH IS GREATER THAN 8.5 FROM ANY SAMPLE, THE SAMPLE <br />WILL BE ANALYZED FOR BORON AND SELENIUM. <br />BASED UPON THE RESULTS OF THESE STUDIES, AND THE UTILIZATION OF ANY <br />PROPOSED SOIL AMENDMENTS, THE APPLICANT SHALL DEMONSTRATE TO THE <br />DIVISION'S SATISFACTION THAT THE PROPOSED OVERBURDEN IS AN <br />ACCEPTABLE PLANT GROWTH MEDIA. <br />WITHIN 60 DAYS OF PERMIT ISSUANCE THE DIVISION DIRECTS EMPIRE <br />ENERGY CORPORATION TO INCORPORATE INTO THE PERMIT APPLICATION THE <br />70PSOIL BASELINE INFORMATION, WHICH HAS ALREADY BEEN COLLECTED, AND <br />TOPSOIL RECLAMATION PLANS FOR THE COAL PROCESSING WASTE PILE, <br />CRUSHER, EMPIRE MAINS FRESH WATER SYSTEM AND UNDERGROUND <br />RESERVOIR. THIS SUBMITTAL SHALL INCLUDE A DEMONSTRATION, <br />ACCEPTABLE TO THE DIVISION, THAT THE PROPOSED PLANS WILL RESULT IN <br />THE UTILIZATION OF A SUITABLE PLANT GROWTH MEDIUM WHICH WILL INSURE <br />RECLAMATION SUCCESS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.