My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL52696
DRMS
>
Back File Migration
>
General Documents
>
GENERAL52696
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:29 PM
Creation date
11/23/2007 7:59:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
7/28/1982
Doc Name
OSM Permit No. CO-0068
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?_mit lumber CO-4068, ( ) <br />Page 6 of 7 <br />r-. The Regulatory Authority directs Bear Coal Company to submit, far review <br />~ and approval by the Regulatory Authority, proposed locations and construction <br />specifications far the three monitoring stations to be installed upon the <br />backfilled material at the dear .lo. 2 portal area. ?mmediately following the <br />comol et i on of backfi 11 i ng and gradi ng of the Bear .lo. 2 portal area, t'rese <br />three monitoring stations shall be installed as specified and surveyed. Sur- <br />veying of *_hese stations shall he repeated on a szmi-annual basis far a period <br />of t:vo years. Results of the surveying of these stations shall be submitted <br />to the Regulatory Authority ~dithin 30 days following completion of the semi- <br />annual surrey. If monitoring of the backfiTled area de*_ects movemerrt, which <br />the Regulatory ,authority determines to represent an indication of imminent <br />hazard, the Bear Coal Company shall expeditiously develop and implement, fal- <br />lowing the Regulatory Authority's approval, a plan to mitigate that hazard and <br />to stdbllZ2 the backfilled areas. <br />8. The Regulatory Authority direC.s Bear Coal Company to perforn Proctor <br />testing *_c determine the moisture-density relations of the materials to be <br />utilized in backfilling the Bear Yo. 1 and Plo. 2 mine portal areas and submit <br />the result to the Regulatory Authority. In conformance with the recommenda- <br />tions of Rocky t4ountain Geotechnical, Inc., the materials shall be placed and <br />compacted to achieve 46X of the maximum proctor density, as determined in <br />accordant= with ASTId standard TES 0-048. Further, Bear Coal Compacry shall <br />submit a certified inspection report to verify completion of backfilling and <br />grading of the Bear ~Ja. 1 and Yo. 2 mine portal areas in conformance with the <br />approved plan. This ~rti-""led report shall be prepared by a qualified regis- <br />^ tired professional engineer or professional geologist. The report shall be <br />submitted to the Regulatory Authority ~nithirt 60 days of `tte gmpleticn of <br />backfilling and grading. <br />4. The Regulatory Authority directs Sear Caal Company to submit a detailed <br />engineering plan fer the portal access road and portal facilities at the gear <br />yo. 3 Mine, for revied and approval by the Regulatory Authority, rro later than <br />30 days fallowing approval of the permanent program permit. This detailed <br />engineering plan shall include road and portal crass-sections, road and portal <br />plan and grade design drawings, and detailed engineering design drawings for <br />all retaining structures and drainaee facilities. Yo additional disturbance <br />shall occur in the area of the portal dCCess road or portal facilities until <br />*.hese detailed engineering plans have been reviewed and approved by the Regu- <br />latory Authority. <br />i0. The ReguTatery .authority directs Bear Coal C;,mpany to submit the locations <br />and construction specifications for monitoring facilities designed to monitor <br />the stability of the ?or :al access read and portal facilities at the Sear Vo. <br />3 'line. inesz monitoring facilities snail tonal r of appropriately located <br />tilt me*_=ring and location monitoring facilities. inese facilities snail .~ <br />de<_igned to mcnitor both the operational and reclaimed con r gurations of the <br />portal access road and portal facilities. Install alien of t`resz monitoring <br />facilities shall occur as immediately following ccnstuction in the aortal <br />access read and portal facility areas as is fe~sibie. ,lanitorina shall rm- <br />mence irmediately following installation and continue on a szmi-annual basis <br />~',+. Until ='d0 ?earS fpl10Wing C.^.mpleti0n Cf the ^eclam aL'.Cn of the portal aCC2S5 <br />rcac end ocrtal farl'ty ar_a. °.esul`s ^_f the =_ami-ann•.:ai ^cnitoring snail ce <br />sucmitted =o the .fie^_uiatcr•/ .;Uthoritl ~,vithin .0 days fci'cwing ccmpiet:an cf <br />=.,et :ami-annual mcritcrine. .- =`z mcnitor'^e :f~these faciiit'?s .et?cts <br />;nv :lament ,a~er_, 'n =he :pima^n .- =-e =e^u!c__r'/ =U~`tor:.,, Sear ~z <br />-_d^'/ i._ -..'2" -. ._. .e,.a' ._ .... ~ ._ n'ro^-. .. ~e9U Spry <br />
The URL can be used to link to this page
Your browser does not support the video tag.