Laserfiche WebLink
Changes to the Current Hydrologic <br />TR16 Monitoring Program Approved <br />Provides As-Built Certification for Portion of <br />TR17 Haul Road D Approved <br />Remedial Plan & Slope Stability Analysis for <br />TR18 Landslide above Pond 012 Approved <br />07/30/2001 <br />07/30/2001 <br />10/03/2001 <br />Incorporation of Highwall Mining and <br />TR21 Recovery of Lennox Coal for Test Burn Approved 09/30/2002 $32,996.00 <br />Changes to the Hydrologic Monitoring <br />Program & the Timing Sequence of Surface <br />TR22 Disturbance Approved 01/06/2003 <br />SECTION III -STATUS OF STIPULATIONS <br />Following is a list of stipulations issued since the submittal of the original permit application <br />along with the status of each. <br />STIPULATION NO. 1 <br />PRIOR TO INITIATING MINE RELATED DISTURBANCE AT THE YOAST MINE, <br />SENECA COAL COMPANY MUST OBTAIN THE FOLLOWING PERMITS AND SUBMIT <br />THEM TO THE DIVISION: <br />NPDES PERMIT REQUIRED PRIOR TO CONSTRUCTION OF ALL SEDIMENT PONDS <br />AT THE YOAST MINE. <br />2. STORMWATER DISCHARGE PERMIT REQUIRED PRIOR TO CONSTRUCTION OF <br />THE HAUL ROAD AND ALL MINING ACTIVITY. <br />3. WATER RIGHTS AND AUGMENTATION APPROVAL -DOCUMENTATION OF <br />APPROVAL-OF WATERRIGHTS AND-AUGMENTATION PLAN FROM DISTRICT- <br />COURT PRIOR TO CONSTRUCTION OF ALL SEDIMENT PONDS AND WATER USE <br />FOR M INING ACTIVITIES. <br />4. ROUTT COUNTY SPECIAL USE PERMIT -PERMIT REQUIRED PRIOR TO <br />CONSTYRUCTION OF HAUL ROAD, IMPACTS TO COUNTY ROADS AND ALL <br />MINING RELATED ACTIVITIES. <br />5. AIIt QUALITY PERMIT -PERMIT REQUIRED PRIOR TO CONSTRUCTION OF HAUL <br />ROAD AND MINING ACTIVITIES. IF AIR PERMIT IS NOT REQUIRED FOR HAUL <br />