Laserfiche WebLink
ROAD CONSTRUCTION, SENECA COAL COMPANY MUST SUBMIT <br />DOCUMENTATION OF THIS FACT. <br />6. FEDERAL AND STATE EXPLOSIVES PERMITS -PRIOR TO CONDUCTING ANY <br />BLASTING ACTNITIES. <br />STATUS: Complied with. All of the permits listed above have been submitted and the <br />stipulation has been satisfied. <br />STIPULATION N0.2 <br />PRIOR TO CONSTRUCTION OF POND 011, SENECA COAL COMPANY MUST SUBMIT <br />ADDITIONAL RECLAMATION PERFORMANCE BOND TO THE DIVISION. THE BOND <br />AMOUNT MUST BE APPROVED BY THE DIVISION. <br />STATUS: Complied with 01/18/96. Stipulation No. 2 has been satisfied by submittal of TR- <br />02. <br />STII'ULATION N0.3 <br />PRIOR TO CONSTRUCTION OF TOPSOIL PILE F, SENECA COAL COMPANY MUST <br />SUBMIT ADDITIONAL RECLAMATION PERFORMANCE BOND TO THE DNISION. <br />THE BOND AMOUNT MUST BE APPROVED BY THE DIVISION. <br />STATUS: Complied with 10/21 /97. Stipulation No. 3 was satisfied by the submittal of MR- <br />l l,which eliminated Topsoil Pile H and transferred the bonding liability associated with Pile H <br />to Pile F. <br />STIPULATION NO.4 <br />PRIOR TO RETENTION OF THE YOAST HAUL ROAD AS PART OF THE POST-MINING <br />LAND USE, A SIGNED CONSENT FORM FROM MANEOTIS SHEEP COMPANY MUST <br />BE SUBMITTED TO THE DNISION. <br />STATUS: Complied with. Stipulation 4 has been satisfied by the submittal of a signed <br />consent form dated 05/08/96, now contained within the permit document. <br />STIPULATION NO. 5 <br />WITHIN 180 DAYS OF PERMIT ISSUANCE AND PRIOR TO CONSTRUCTION OF POND <br />011, THE APPLICANT SHALL SUBMIT A TECHNICAL REVISION TO THE YOAST <br />PERMIT WHICH DEMONSTRATES THAT POND 011 WILL BE LOCATED AS NEAR AS <br />PRACTICABLE TO THE DISTURBED AREA AND THAT THE POND EMBANKMENT <br />HAS A MINIMUM STATIC SAFETY FACTOR OF 1.3. <br />