My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL52137
DRMS
>
Back File Migration
>
General Documents
>
GENERAL52137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:07 PM
Creation date
11/23/2007 7:29:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981031
IBM Index Class Name
General Documents
Doc Date
7/3/1990
Doc Name
CIVIL PENALTY RECLAMATION COOPERATIVE AGREEMENT GR090081
From
OSM
To
MLRD
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-z- <br />ARTICLE III. PURPOSE, SCOPE, AND SPECIAL PROVISIONS OF PROJECT LdORri <br />Section 1. LOCATION: New Pryor Reclamation Project <br />Huerfano County, Colorado <br />Section 19, Township 29 South, Range 65 west <br />Approximately 15 acres <br />Section 2. PURPOSE: The purpose of the Cooperative <br />Agreement is to reclaim the New Pryor <br />Reclamation site (hereafter referred to as the <br />Project). <br />Authorized activities include basic surveying, <br />geotechnical investigations, design, bid <br />advertisement and award, construction, <br />inspection, and maintenance during the first <br />year following the completion of this <br />cooperative agreement. <br />Reclamation activities are intended to eliminate <br />the dangerous highwall and correct the severe <br />erosion and failing vegetation at the site. The <br />Recipient is not responsible for further <br />reclamation beyond the maintenance performed <br />during the first year following the completion <br />of the Project. <br />Section 3. SCOPE OF WORK <br />The Recipient is responsible for the following <br />project work. <br />Section 3.1 Preparation of real estate requirement including <br />the determination of current owners and legal <br />descriptions of land to be reclaimed. <br />Section 3.2 Modifications to currently approved NEPA <br />compliance documents that may become necessary <br />due to changes in the project scope of work or <br />reclamation techniques. <br />Section 3.3 Preparation of an engineering design and <br />construction bid package for the Project that <br />will, with funds available, result in the <br />reclamation of the identified site hazards, <br />especially the dangerous highwalls. <br />Section 3.4 Submission, to the OSM Project Officer, of 2 <br />copies of the final design package (including <br />standard clauses, plans, specifications, <br />statement of work, cost estimates, and design <br />
The URL can be used to link to this page
Your browser does not support the video tag.