Laserfiche WebLink
Stipulation No. 2 <br />The operator will be responsible for repair of any subsidence which might <br />occur in existing underground workings within 250 feet of the strip pit <br />boundary. <br />Attached to the permit document, this stipulation is ongoing. <br />Stipulation No. 3 <br />By January 22, 1993, the operator must submit a description of the <br />drilling program for two exploration holes, including a map showing the <br />location of the holes, pads and access roads, a discussion of any <br />affected aquifers, and a bond calculation for the reclamation of the <br />holes, pads and road disturbance. <br />Attached to Minor Revision No. 1, this stipulation was satisfied. Bond <br />was not increased because the phase two mining reclamation bond already <br />covered disturbance in this area. <br />Stipulation No. 4 <br />By January 22, 1993, the operator must submit a description of the pond <br />expansion operation, including a map showing the location of the <br />undisturbed area for material placement, a description of the treatment <br />of the topsoil and a bond calculation for reclamation of the site. <br />Attached to Minor Revision No. 2, this stipulation was satisfied. Bond <br />was not increased because this site was to become part of the coal <br />stockpile area and, therefore, was already bonded fdr reclamation. <br />Section IV - Permit Updates <br />The following questions and comments need to be addressed in order to update <br />the permit. Revised pages need to have the revision date on the bottom of <br />each page. <br />1. General Permit Information <br />A. Permit Application Form <br />1) The names and addresses of the operator, permitting contact <br />and inspection contact need to be updated on page 3. <br />B. Section 2.03.4, Identification of Interests <br />1) On page 1, update the mailing address of Rimrock Coal Company. <br />2) On page 1, update the owner and proprieter information. <br />-4- <br />