My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51882
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:58 PM
Creation date
11/23/2007 7:12:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
General Documents
Doc Name
SPECIAL CONDITIONS TRINIDAD BASIN MINING RECLAMATIONS PROJECT MVC-MINES-
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task~9 ,-:Ditch•end GaU,y Repalt <br />gone of Work and Work Deccrintinn <br />rt: <br />;:}. <br />Appro~dmately 100 feet of the failed ditch to Pond IS-P8 shall be removed (filled) and <br />graded to original contour. The ~e adjacent gully resulting from this failure shall be <br />repaired by creating a gentle swale 3 ~`eet deep containing riprap. The riprap material must <br />consist of durable irregular rock having a minimum D-50 bf 6 inches and a D-max of 9 <br />inches. Riprap will have to be imported. <br />There will be no measurement for Task #9. Payment for Task #9 will be reflected in a <br />lump sum under item #9 on the Bid Schedule. <br />Task 10 -Spillway Repair <br />,ape of Work and Work Description <br />The emergenry spillways of Ponds 15-Pll and 15-P32 shall be lowered one and one-half <br />(1 1/2) feet to accommodate a. total of 3 feet of riprap. Riprap material must consist of <br />durable irregular rock having aminimum D-50 of 6 inches and a D-max of 9 inches. Riprap <br />w~11 have to be imported <br />There wr71'be no measurement for Task # 10. Payment for Task #10 will be reflected under <br />Item #10 on the Bid Schedule. <br />Task 11-Riser Modification <br />Soooe of Work and.Work Description <br />Risers on the primary spillways of ponds 22-P5, 22-P6 and 22-P10 shall be removed and the <br />pipes comrerted to culverts, by the addition of 10 ft. of CSP pipe respectively to eaosting pipe <br />so that it extends into the goad This wr11 require excavating around existing pipe prior to <br />cutting and attaching additional pipe. <br />There will be no measurement for Task #11. Payment for Task #11 will be reflected under <br />Item #11 on the Bid Schedule. <br />Task 12 -Trailer Removal <br />Ssoue.of Work and Work Description <br />The white, 40-foot house trailer and all trash associated with the trailer site located in the <br />south central portiomof Section 1S shall be removed and disposed of in an approved landfill. <br />There will be no measurement for Task #12. Payment for.Task #12 will be reflected under <br />Item #12 on the Bid Schedule. <br />Task 13 - Revegetation <br />ape of.Work and Work Description <br />Upon completion. of the final grading all azeas in Sections 15 and 22, disturbed during <br />reclamation work, and any other azeas specified in these Special Conditions will be <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.