My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51882
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:58 PM
Creation date
11/23/2007 7:12:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
General Documents
Doc Name
SPECIAL CONDITIONS TRINIDAD BASIN MINING RECLAMATIONS PROJECT MVC-MINES-
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b.lc' - cs v. ._yw a"• _,~ v.y': _ r~:;i~,~i.::.: F-6 ~}~it{.:,«~ •"ytSi~~.,. <br />reve~etated according to the Revegetatioa Scafions in the General Bid Speq~cations, . <br />Section 20:0. Disturbed land will be fertt7ized, broadcast seeded, mulched and crimped. <br />Commeraal fertilizer is required for this project <br />Seed will be supplied by the OWNER The Pinon-Juniper seed mix will be used on all <br />areas, - <br />The following requirements apply: <br />The awarded CONTRACTOR will notify the PROJECT MANAGER two (2) weeks in <br />advance of his notice to proceed with the revegetation phase of the project <br />The OWNER will supply all the seed for the revegetation work. <br />The CONTRACTOR will supply the fertilizer, mulch, equipment for. fertilizer <br />~p on, seeding, mulching and crimping on a~ and all of these procedures which will <br />Measurement and Payment <br />The regegetated area wt11 be measured to the neazest 0.1 acreage. payment for Task 11 will <br />be based on the unit price bid under Item it and on the Bid Schedule and the actual <br />number of acres revegetated. This unit price cost wID Dover payment of all costs associated <br />with each component of the revegetation project a~ or all incidental costs incuried by the <br />CONTRACTOR shall be reflected in each Bid Item of shall be paid at the <br />CONTRACTOR'S expense. <br />Task #14 -Non-Guaranteed Re[oiestation <br />,ape of Work <br />Two areas north of Pond 15-P20 and south of Pond 22-P17 will require the planting of <br />native trees to help stabilize steep slopes. <br />Work Descri tion <br />Rocky Mountain Juniper and Pinon Pine tree "tubelings" shall be planted using a twenty <br />(20) foot center diamond shaped pattern. 'Itvo azeas will be covered namely: <br />An azea 100 feet by 200 feet, lying directly west of the ditch to Pond 15-P20 will require 75 <br />trees, (see Map #S~: <br />An azea south of Pond 22-P17 will require one hundred seventy five (175) trees in an area <br />100 feet by 500 feet, (see Map #5). <br />Fertilizer tablet shall be incorporated into the soil for each tabling, in addition to <br />polyacrylaminide, which shall be incorporated into the soil for each tabling at the rate <br />recommended by the CBEs. <br />There will be no measurement for Task #14. Payment for Task #14 will be reflected in a <br />lump sum bid under Item #6 on the Bid Schedule: <br />Task #15 -Non-Guaranteed Pond 15-P1 Cleanoat <br />
The URL can be used to link to this page
Your browser does not support the video tag.