Laserfiche WebLink
<br />Task6 Ditch' Repair, Gblvert rnstauaaon, and'Rock Swale Constradion. <br />Work Descdpaon <br />Ttvo hundred seventy-five (275) feet of ditch, from the south edge of pond 22-P10 to a point <br />approximately halfway between the Pond and (~ilvert G10 will be widened, shaped and <br />nprapped as shown in Drawing #2. At this point an 8 ft. x 2 ft: berm will be tilled <br />across the ditch and a 30-inch CPS culvert under the road. The culvert will be <br />approximately 50 feet in length. 22-0 <br />At culvert G3, approximately 800 feet southeast of Pond 22-P~ 20-foot wide x 2 ft deep <br />rock swale will be constructed across the road. <br />There will be no measurement for Task #6. Payment.for Task #6 will be reflected in a <br />lump sum bid under Item #6 on the Bid Schedule. <br />Task 7 - SpWway Repair and ~(leanoat o[ Pond 15-P20 and Removal of Associated Ditch <br />Pond :15-P20. <br />Scooe o[ Work <br />Starting at the Ditch dischazge into pond 15-P20, the ditch shall be removed (filled) for a <br />distance of 350 feet north, and graded to original contour. Revegetation shall be according <br />to specifications in Section 20.0 of the General Bid Specifications, 1993. <br />The emergenry spillway of Pond IS-P20 shall be lowered .one (1) foot and graded to <br />accommodate additional riprsp (total r-PmP thickness of 3 feet). Riprap matenal for.the <br />spillway must consist of durable, in egnlar rock having a minimum D-50 of 6 inches and D- <br />max of 9 inches. Riprap will have to be imported. <br />The sediment delta in pond 75-P20 shall be removed, and the resulting material <br />incorporated into the azea to. be reclaimed at Pond 15-P10. <br />There will be no measurement for Task #7. Payment for Task #7 will be reflected in a <br />lump sum bid under Item #8 on the Bid Schedule. <br />Task #8 -Spillway Removal Pond 22-P4. <br />Srnpe of Work and Work Description <br />The emergenry spillway shall be removed from Pond 2~P4, allowing free flow around the <br />embanlrment. (`are must be taken to not disturb portions of the embanlmient where <br />vegetation is well established. Additionally a 10-foot section of Ditch Z~P10, shall be <br />removed, and flow directed into Pond 22-P4. <br />3 r~~`k <br />~- e <br />~ a -o' ~~I <br />There will be no measurement for Task #8. Payment for Task #8 will be reflected in a <br />lump sum bid under Item #8 on the Bid Schedule. . <br />