My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51882
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:58 PM
Creation date
11/23/2007 7:12:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
General Documents
Doc Name
SPECIAL CONDITIONS TRINIDAD BASIN MINING RECLAMATIONS PROJECT MVC-MINES-
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
... ,. <br />~' <br />.. ~~_ ~.d :qfd . <br />5. _ . r~ <br />;:'development .of e:~aonnal~stream channel .(see Map #4). A mine.~t•a,..:_ `~e,~nadYw111~.cross: <br />~' the realigned channel.by a riprap low water. crossing. This porttothe• task r • es <br />excavating the road, plus ten (10~ feet on each side of the road, a deptli of two (2 feet <br />below stream channel grade and replacing with two feet of riprap (see Map #4). Riprap <br />material for the road crossmg must consist of durable irregular rock have a minimum <br />. D - 50 of 6 inches and D-max of 9 inches.. Riprap will have to be imported. Channel <br />configuration; and limits will be staked by DMG personnel The portion of the haul road <br />below the riprapped crossing shall be re-graded to eliminate a large erosion gully. Width <br />and grade off the road shall not be changed. <br />Task 4 Pond 15-P10 Removal <br />Scone o[work <br />The purpose of this task is to completely remove Pond 15-P10 which is not permitted as a <br />permanent pond. <br />The east, south aad west embanlmnents of Pond IS-P10 shall be removed and incorporated <br />into the north side of the inslope. The resulting new slope shall be graded to approximate <br />original contour. Revegetation shall be according to specifications in section 20.9 of the <br />General Bid Specification, 1993. <br />There will ~be no measurement for payment for Task #4. Payment for Task #4 will be <br />reflected in a lump sum bid under Item 4 on the Bid Schedule. <br />Task 5 - Reoonslrnction of Pond 22-P10 <br />scone of work <br />The purpose of this task is.to construct a new northwest embanlmlent for Pond 22-P10, <br />repair damage to the adjacent haulage road, and install a new culvert under the road. <br />work Description <br />Anew northwest embankment shall be constructed between the haul road and a prominent <br />siltstone outcrop on the southwest side of the existing Pond It will be approximately five <br />feet high by 60 feet in length, .with an 8-foot crest width. Some material for rts construction <br />is avaflable from the Pond, however care must be taken not to damage willows which have <br />become established within the Pond. The majority of construction material will have to be <br />imported, possibly from the Pond 15-P10 or stream realignment areas. Gullies cutting into <br />the road northwest of the pond shall be filled and the road regraded. The existing culvert <br />at Pond 22-P10 will be supplemented with a 36-inch .CPS culvert. It shall be installed <br />adjacent to and at. the same grade as the existing culvert. Estimated length is 50 feet <br />There will be no measurement for Task #5. Payment for Task #5 will be reflected in a <br />lump sum bid under Item 5 on the Bid Schedule. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.