Laserfiche WebLink
"~ <br />' (:.~..~ <br />Task 1- Mobllizatioa and lleaioblllzatlon <br />The CONTRAC'PUR shall exerc>se caution during mobilization, performance of all work <br />tasks, and demobt7ization in order to avoid damage to public and private property including, <br />but not limited to, railroad tracks, pavements, soils, vegetation, water supplies, fences, walls, <br />structures, existing sediment Ponds, landsaping, etc. The CONTRACTOR shall repair and <br />restore public or private properly damaged during the work at his expense. <br />The CONTRACTOR shall be fully responsible for any and all damage to property caused <br />by his equipment or personnel The CONTRACTOR shall ensure that the job site is <br />restored to original or better condition and that the PROJECT MANAGER accept that the <br />work is complete. <br />MOBIIIZATION <br />This task includes moving equipment and supplies to the project area. if desired, the <br />CONTRACTOR may establish a staging area for.the storage of all equipment and supplies. <br />The area shall be of adequate size to accommodate all of the CONTRACPOR'S vehicles, <br />equipment and supplies and shall be approved by the PROJP.CT MANAGER. The <br />CONTRACTOR shall *~f~n+m;~p impact on the staging area with regard to noise, dust, and <br />fumes. The CONTRACTOR shall be responsble for •maintaining security of the staging <br />azea.~ <br />This task also includes all labor and costs associated with locating and protecking utilities, <br />both above ground and underground,.at the work site. Contamination of soil and surface <br />or ground water from petroleum products will not be permitted and must be taken into <br />consideration. <br />' See also Section 1.0 of the "Standard Work Specification" included in DM&G General Bid <br />Specifications, 1993. <br />DEMOBILIZATION <br />This item shall include all labor, equipment, and costs associated with demobilization and <br />clean-up of the work site to its original or better condition. All equipment and supplies, <br />materials, and debris related to this project will be removed from the site upon completion. <br />The CONTRAC'POR shall also reclaim aay staging azea or other ground disturbed during <br />the course of the project located outside of the project area as defined by this Bid <br />Document. All haul roads shall be fully regraded and reclaimed upon compledon of the <br />projecrt. Additional final grading shall be accomplished, if needed, to reduce steep slopes <br />and contour on the project site azeas not specifically addressed in the work plan. See also <br />Section 1.0 of the "Standard Work Specifications" included in DMfYcG General Bid <br />Specifications, 1993. <br />REMOBII i7,ATION <br />See Section 1.0 of ffie "Standard Work Specifications" included in DMf4cG General Bid <br />Specifications, 1993. <br />MEASUREMENT AND PAYMENT <br />See Section 1.0 of the "Standard Work Specification" included in DM&G General Bid <br />Specifications, 1993. <br />4 <br />