My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51816
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51816
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:55 PM
Creation date
11/23/2007 7:10:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
General Documents
Doc Date
2/18/1986
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Terror Creek Mid-Term - 3 - February 12, 1986 <br />5: The reclamation plan describes replacement of 5 inches of topsoil. <br />The AVF response of June 20, 1983 describes replacement o.f 9 <br />inches. Which is correct? Submit field calculations of the amount <br />of topsoil contained in stockpiles on site. <br />~escribe and delineate on a map what structures are to remain on <br />site after reclamation. <br />r 7. Map 10 indicates that the access road will end at the current <br />office. How is this road to replace County Road 4365 and provide <br />access to three other residences after reclamation? <br />`, <br />• 8. Terror Creek Company should demonstrate that sufficient material <br />exists in the bench to meet AOC. <br />~9: What is the "local waste disposal facility" described on page <br />2.05-8? <br />10. The reclamation plan describes that the sediment pond will remain <br />during the reclamation period. Map 10, however, indicates that <br />almost all of the reclaimed area will be topographically lower than <br />- the current sediment pond following backfi111ng and grading. Is <br />Terror Creek Company proposing use of an interim pond? If not a <br />~' demonstration should be made as to how drainage is to be directed <br />to and reach the sediment pond. Appropriate maps should be <br />included. <br />~Y1. Terror Creek Company should describe the use of and delineate the <br />location of the light use road contained in the bond calculations. <br />Part II. Status of Stipulations <br />Stipulation 1: Submittal of reclamation bond <br />Status: Resolved <br />Stipulation 2: Grade, topsoil, and seed 0.35 acre area removed from permit <br />area <br />Status: Resolved <br />Part III. Bonding <br />Bond calculations were updated using current equipment rental and operating <br />costs and wages. In addition current administrative (indirect) costs have <br />been included. <br />These changes have resulted in a substantial increase in the calculated bond <br />amount. The current bond should be revised or supplemented to meet this <br />amount. <br />
The URL can be used to link to this page
Your browser does not support the video tag.