Terror Creek Mid-Term - 4 - February 12, 1986 <br />Conveyor Structure <br />BOND CALCULATIONS REVISED <br />Area o ume Estimates <br />Approx. 550 if according to map 5 <br />2 Mill Wrights with tools @ X19.98 1f according to Means Building <br />Construction Cost Data 1985 <br />Backfilling and Grading <br />Debris Removal from Pad Area <br />1.74 acres, 1 ft. thick = 2,807 yds3 <br />Average push distance - 100' level <br />Placement of Colluvial Material Over Debris <br />395' x 55' x 4' = 4,138 BCY <br />Average push distance - 100' <br />Pad Area <br />Volume = 70,781 BCY <br />Average push distance - 180' uphill 10% <br />Light Use Road <br />Volume = 400' x 35' x 3' = 2,000 BCY <br />Average push distance for crawler tractor - 50' - level <br />Final Grading <br />Area - 9 Acres <br />Average push distance for crawler tractor - 200' -level <br />Topsoil Replacement <br />11,000 yds3 <br />Average haul distance = 700' <br />Replacement with scrapers <br />Scarification <br />Area - 9 Acres - 392,000 ft2 <br />Scarify on 6' centers with crawler tractor ripper <br />Seeding and Planting <br />Area - 9 Acres <br />Prepare seed bed with farm implements <br />Seed <br />Irrigation <br />Utilize existing water rights <br />Annual maintenance required <br />