Laserfiche WebLink
D. RESCREENING/CLASSIFYING N �- <br /> Maximum tons screened per year tons . <br /> Maximum tons screened per hour tons . <br /> Hours of rescreening per day hours . <br /> Proposed controls (see above) <br /> VII. CONVEYORS/TRANSFER POINTS <br /> A. CONVEYORS, <br /> Tons of material conveyed per year tons . <br /> Tons of material ccnveyod per day tons . <br /> Proposed controls _ <br /> Controls for conveyors include : Full enclosure, partial enclosure, no <br /> control, other (specify) <br /> (INDICATE ON A SEPARATE DIAGRAM HOW CONVEYOR SYSTEM IS SET UP) <br /> B. TRANSFER POINTS , 71 <br /> Number of transfer points <br /> Proposed controls _ <br /> Controls for transfer points include : Full enclosure, partial <br /> enclosure, water sprays, chemical suppressants , no controls, other <br /> (specify) <br /> 6 <br />