Laserfiche WebLink
D. LOADING OUT FROM RAW MATERIAL STOCKPILE: <br /> Method of loading out (front-end loader, conveyor, etc. ) <br /> Loading schedule : _� tons/hour /T2 hours/day —/��d ys(year <br /> Proposed controls for loading to stockpile: Igo rNle nee �r�.{. <br /> Controls include: no control, water sprays , total exposure, partial <br /> exxpposure, moist material, other (specify) ,1L .. ,� d ;.Vp@�� <br /> r- is }-oak 'has bee kL cLt- o r SDr{-g rL l (- ,S�v o <br /> VI.. PROCESSING <br /> `1:+ {S 6 Pt Pcz ll E <br /> Will processing (i . e. , crushing, screening, etc . ) occur on site? <br /> El Yes 17, No (heck one) <br /> NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMIT APPLICATION AND <br /> APEX (SEPARATE FORM IS ATTACHED AT END OF THS FORM - MAKE ADDITIONAL <br /> COPIES AS NEEDED) . <br /> Material loaded into processing equipment by: <br /> Conveyor Front end loader Other N <br /> CONTROLS FOR PROCESSING INCLUDE: Moist or wet materials (specify <br /> moisture % if knovm) , water spray bars , bag filters , other <br /> (specify) , no control . If existing processing equipment will be <br /> relocated from anther location complete the following sections . <br /> This equipment must already be- permitted. <br /> (LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACES BELOW) <br /> A. PRIMARY CRUSHING /v <br /> Maximum tons crushed per year tons . <br /> Maximum tons crushed per hour tons . <br /> Hours of crushing per day hours . <br /> Proposed controls (see above) /� <br /> B. SCREENING/CLASSIFYING jv-, <br /> Maximum tons screened per year tons . <br /> Maximum tons screened per hour tons . <br /> Hours of screening per day hours . <br /> Proposed controls (see above) /� <br /> C. SECONDARY CRUSHING A)A� <br /> Maximum tons crushed per year tons . <br /> Maximum tons crushed per hour tons . <br /> Hours of crushing per day hours . <br /> Proposed controls (see above) <br /> 5 <br />