My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-06-08_GENERAL DOCUMENTS - M1981057
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1981057
>
1999-06-08_GENERAL DOCUMENTS - M1981057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2021 11:35:00 AM
Creation date
11/23/2007 7:10:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981057
IBM Index Class Name
General Documents
Doc Date
6/8/1999
Doc Name
AIR POLLUTION EMISSION NOTICE APEN AND CONTROL PLAN FOR FUGITIVE PARTICULATE EMISSIONS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VIII. FINISHED PRODUCT <br /> A. LOADING INTO FINISHED PRODUCT STOCKPILE <br /> Method of loading in (front-end loader, conveyor, etc . ) <br /> lorc�ocl Oil � kaa bw � 4h , ,Oa pa � r <br /> If conveyor is u ed, what is aximum drop height? .y..J�� r- <br /> Loading schedule: _ tons/hour hours/days days/year 1 oar , <br /> Proposed controls _ <br /> Controls for loading to stockpile include other (specify) , no control <br /> water sprays, total enclosure, partial enclosure, chemical suppressants, <br /> reduced drop height , telescoping chute 1 <br /> H. FINISHED PRODUCT STOCKPILE / cL'�e 1S 2 Y� q b0 4 �1 <br /> Maximum tons stored. at one time tons . to Als d- <br /> Length of time pile remains undisturbed ('4, <br /> Proposed controls : (check appropriate boxes) pks:6-- <br /> ❑ Watering _ times/day, or continuous sprinkler (to <br /> maintain moist surface) . <br /> ❑ Chemical stabilizer (applied according to manufacturer ' s <br /> specifications) . <br /> ❑ Compacting of piles, method _ <br /> ❑ Enclosures : complete, or partial (check one) <br /> ❑ Revegetation, (length of time till revegetation ) <br /> ❑1 Other (specify) <br /> No control <br /> C. LOADING OUT FROM STOCK?TT.•F• FOR FINAL TRANSPORT <br /> Method of loading out r nt-end loade conveyor, etc . ) <br /> If conveyor is used, what is maximum drop height? A ft . <br /> Loading schedule : _ tons/hour hours/day days/year <br /> Proposed controls _ <br /> Controls for loading out of stockpile include Water injection, <br /> chemical dust suppressants, bag collectors, other (specify) , no control <br /> water sprays, total enclosure, partial enclosure, chemical supprgsants, <br /> reduced drop height, telescoping chute . /Uv N Q luee C�_a,4- <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.