Laserfiche WebLink
<br />Stipulation No. 21: <br />Stipulation to Technical Revision 05: <br /> <br />THE OPERATOR WILL MONITOR THE DIVERSION DITCH ABOVE THE RIENAU N0. 2 MINE <br />SEMI-ANNUALLY, AND ANNUALLY REPORT TO THE DIVISION THE PERFORMANCE OF THE <br />DITCH. THIS MONITORING WILL CONTINUE THROUGHOUT THE RECLAMATION BONDING <br />PERIOD. IF INSTABILITY IS EVIDENCED PRIOR TO EXPIRATION OF THE BONDING <br />PERI00, THE OPERATOR MAY BE REQUIRED TO RECLAIM THE DITCH IN ACCORDANCE <br />WITH THE ORIGINAL APPROVAL RECLAMATION PLAN. <br />-3- <br />