Laserfiche WebLink
water from the active workings so there aze no dischazges to monitor. With the closure and final <br />reclamation of the mine, water is no longer imported or used by the Southfield Mine. <br />STIPULATION NO. 7 <br />THE APPLICANT SHALL SUBMIT A HYDROLOGIC MONITORING REPORT FOR THE <br />SOUTHFIELD MINE. THE MONITORING REPORT SHALL INCLUDE A SUMMARY <br />AND ANALYSIS OF DATA COLLECTED TO DATE, INCLUDING: 1) WATER USED IN <br />THE MINING OPERATION, 2) MINE WATER DISCHARGES TO RECEIVING STREAMS <br />(QUANTITY AND QUALITY), 3) MINE WATER INFLOWS (ANNUAL MINE INFLOW <br />STUDY), 4) STREAM FLOWS AND QUALITY, AND 5) IMPACTS TO THE QUALITY <br />AND QUANTITY OF BEDROCK AQUIFERS. THE MONITORING REPORT SHOULD <br />UPDATE THE STATEMENT OF PROBABLE HYDROLOGIC CONSEQUENCES AND <br />INCLUDE A DESCRIPTION OF MITIGATIVE MEASURES TAKEN TO MINIMIZE <br />DISTURBANCE TO THE PREVAILING HYDROLOGIC BALANCE AND A PLAN FOR <br />MODIFYING THE MONITORING PLAN IF NEEDED. THE MONITORING REPORT <br />SHALL BE ADEQUATE TO PLAN FOR MODIFICATION OF SURFACE OR <br />UNDERGROUND MINING ACTIVITIES, IF NECESSARY, TO MINIMIZE DISTURBANCE <br />TO THE PREVAILING HYDROLOGIC BALANCE. THE REPORT IS DUE AUGUST 1, <br />1985. <br />Status -Terminated <br />This stipulation was terminated with the approval of Permit Renewal Ol, which incorporated the <br />submittal of an Annual Hydrology Report. The AHR includes all of the above items into pages <br />2.05.6-52 through 2.05.6-54 and Exhibit 25 of the pemut application. <br />STIPULATION NO. 8 <br />THE APPLICANT SHALL SUBMIT A PLAN FOR MONITORING THE SUCCESS OF <br />REVEGETATION WITHIN 180 DAYS OF PERMIT ISSUANCE. <br />Status - In Compliance. Terminated <br />On January 29, 1985, a plan for monitoring revegetation was submitted and on February 26, 1985 <br />the plan was accepted. This was incorporated into the new permit application with the approval <br />of Permit Renewal 1, November 27, 1989. <br />STIPULATION NO. 9 <br />THE OPERATOR SHALL POST AND MAINTAIN "STEEP SLOPE CAUTION SIGNS" <br />ALONG THE ACCESS ROAD TO THE REFUSE DUMP. TWO MONTHS PRIOR TO <br />ABANDONMENT AND RECLAMATION OF THE ACCESS ROAD, THE OPERATOR <br />SHALL SUBMIT APPROPRIATE GEOTECHNICAL STABILITY ANALYSIS TO <br />Southfield Mule Permit Renewa104 4 September 10, 2004 <br />