Laserfiche WebLink
Summary of Stipulations <br />STIPULATION NO. 1 <br />THE OPERATOR SHALL SUBMIT RIGHT OF ENTRY INFORMATION FOR THE <br />FLORENCE CITY, A.T. MASSEY, AND CORLEY PROPERTIES, WHERE SUBSIDENCE IS <br />PROPOSED, 30 DAYS PRIOR TO AFFECTING THESE LANDS. <br />Status -Terminated <br />This stipulation was terminated with the issuance of the decision for Permit Revision 1, March <br />11, 1991. Stipulation 12 was issued at that time to cover additional required right of entry <br />information. <br />STIPULATION N0.2 <br />THE OPERATOR SHALL CONTINUE ALL HYDROLOGIC MONITORING OUTLINED IN <br />THE APPLICATION AND THIS FINDINGS DOCUMENT UNTIL SUCH TIME AS THE <br />DIVISION APPROVES OF MODIFICATION OR CANCELLATION OF THE PROGRAM. <br />Status -Terminated <br />The revised pemut application, submitted in conjunction with the permit renewal and approved <br />11/27/89, included a hydrologic monitoring plan as Exhibit 25. <br />STIPULATION N0.3 <br />WITHIN 180 DAYS OF PERMIT ISSUANCE THE OPERATOR SHALL PROVIDE <br />DOCUMENTATION THAT THE APPROPRIATE FILINGS HAVE BEEN MADE WITH THE <br />STATE ENGINEER'S OFFICE OR APPLICABLE WATER COURT REGARDING THE <br />STORAGE AND CONSUMPTIVE USE OF WATER AT THE MINE. <br />Status -Terminated <br />This stipulation was reviewed during Permit Renewa101, and was replaced with Stipulation 13, <br />November 27, 1989. <br />STIPULATION N0.4 <br />WITH RESPECT TO THAT PORTION OF THE COAL LOAD-OUT LOCATED WEST OF <br />THE COUNTY ROAD 79 IDENTIFIED AS AN ALLUVIAL VALLEY FLOOR, WITHIN <br />TWO YEARS AFTER THE COMMENCEMENT OF THE PERIOD OF EXTENDED <br />LIABILITY AS SPECIFIED IN RULE 4.15.7(5) THE OPERATOR SHALL COMPARE THE <br />Southfield Mine Permit Renewal 04 2 September 10, 2004 <br />