Laserfiche WebLink
STIPULATION N0.25 <br />THE OPERATOR WILL SUBMIT A REVISED MAP 1, WHICH DEPICTS THE LOADOUT <br />PERIMETER BOUNDARY. THIS MAP WILL BE SUBMITTED AS PART OF THE <br />ONGOING TECHNICAL REVISION 20. <br />Status-Complied With, Terminated <br />This stipulation was complied with on 26 September 1995 with the approval of Technical <br />Revision 20. <br />STIPULATION N0.26 <br />THE PERMIT BOUNDARY SHALL BE REVISED IN ACCORDANCE WITH TECHNICAL <br />REVISION 23, ON MAPS 6, 17, 19, 20 AND 28. THREE COPIES OF THE MAPS SHALL BE <br />SUBMITTED VIA THE MINOR REVISION PROCESS NO LATER THAN 10 JULY 1996. <br />Status -Complied With. Terminated <br />This stipulation was complied with on 19 August 1996 with the submission of updated maps 6, <br />17, 19, 20 and 28, which were submitted in conjunction with Technical Revision 23. <br />STIPULATION N0.27 <br />EFCI MUST SUBMIT A PLAN THAT ADDRESSES THE REQUIREMENTS OF SECTION <br />4.06.2(4) FOR THE LOADOUT AREA PONDS, OR SUBMIT A PLAN THAT INCLUDES <br />PROVISIONS FOR IMPORTED TOPSOIL MATERIAL FOR THE LOADOUT AREA <br />PONDS. EFCI'S PROPOSAL, IN THE FORM OF A REVISION TO THE PERMIT, MUST <br />BE RECEIVED BY THE DIVISION NO LATER THAT 10 JULY 1998. <br />Status -Complied With. Terminated <br />The required submittal date for this stipulation was extended with the approval of Minor <br />Revision 35 on 12 May 1998. The stipulation was complied with on 17 July 1998 with the <br />approval of Minor Revision 38. <br />Southfield Mine Permit Renewal 04 12 September 10, 2004 <br />