Laserfiche WebLink
<br />1 <br /> <br /> <br /> <br />1 <br />1 <br /> <br />L1 <br />r <br /> <br /> <br /> <br /> <br /> <br />Cl <br /> <br />1 <br />1 <br />The following roads will be used as "Primary Use Highways" during <br />construction of the pipeline. <br />Road Type Road Name <br />Interstate Highways I-70 <br />Colorado State Roads Highway 13 <br />County Roads Rio Blanco County Road 5 <br />Garfield County Road 215 <br />Sufficient equipment will be utilized to support three construction spreads with <br />various smaller specialty crews. Construction equipment will include trucks, <br />loaders, compressors, various sized bulldozers, shovels and backhoes, trackhoes, <br />trenchers, boring machines, cranes, side booms, generators, and bending <br />machines. Numerous private vehicles, pickups, and smaller trucks will also be <br />used for transportation. <br />Hauling and stringing of materials on the ROW will be performed in such a <br />manner as to prevent damage to areas outside of the ROW and to prevent <br />interference with normal uses of the lands crossed. Gaps will be left to allow <br />livestock to pass across the ROW. Roads will not be blocked during hauling <br />operations on designated access roads. <br />3.1.8 Miscellaneous <br />• Noise: Noise from pipeline construction will be distributed over the <br />segments of the project being constructed. Noise will be caused by engines and <br />earth removal and will be more concentrated where excavation and trenching <br />are taking place. This noise is limited to pipeline construction activities. <br />• Pipeline Quality Control: All pipeline facilities will be designed and <br />constructed in accordance with applicable requirements of 49 CFR Part 195 <br />"Transportation of Hazardous Liquids by Pipeline" and in compliance with the <br />OSHA regulations pertaining to pipeline construction and operation. American <br />Soda will x-ray 100 percent of all girth welds until welding qualities are <br />acceptable. X-ray could be reduced but will remain above the required 10 percent. <br />Quality control inspection of the physical pipeline and its integrity will be <br />provided by American Soda. <br />• Construction Waste and Human Waste: The pipeline construction project <br />will be maintained in a sanitary condition at all times; project waste materials <br />Pipekne INormaoon Sumvury 11 <br />Yankee GW[ll Sodium Minerals Prolecr <br />American Soda, L.LP. <br />