Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />t <br />1 <br />1 <br />1 <br />1 <br />Table 3 Preliminary Construction Spread Work Components <br />Work Components Spread 1 Spread 2 Spread 3 <br />Distance (miles) 8 25 11 <br />Stream crossings 1 3 2 <br />Wetland crossings 0 1 0 <br />Rock excavation locations 1 2 1 <br />Pipeline crossings 0 5 2 <br />Irrigation ditch crossings 1 4 3 <br />Railroad crossings 0 0 0 <br />County road crossings 1 2 1 <br />BLM road crossings 0 0 0 <br />The spacing of the flags will be determined in the field by the survey party chiefs, <br />with the intent being to clearly delineate the various use areas. In general, <br />spacing in rough terrain will be every 100 to 200 feet. Survey station numbers <br />will be marked on the boundary stakes and/or on laths at the entrance and exit of <br />public lands. American Soda will maintain all boundary stakes and/or laths in <br />place until final cleanup and restoration are completed or approved by the BLM. <br />Table 4 Flagging Color Markings <br />Color Use <br />White Right-of-way edge <br />Orange /Blue Survey points of intersection <br />Orange Trench centerline <br />Red Crossing of existing pipeline <br />Blue Archaeological area <br />Green Parallel pipeline <br />Yellow /White Temporary use area <br />Red /White Threatened and endangered plants <br />Pink /Black Noxious weeds <br />Red /Black Wetlands <br />PipeGrc Womunon Summary <br />Yankee GWCh Sodrum Mircrala Pm~ect <br />American Soda, L.L.P. <br />8 <br />