My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51314
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:36 PM
Creation date
11/23/2007 6:41:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981024
IBM Index Class Name
General Documents
Doc Date
9/23/1986
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ <br />6 <br />C <br />b. The operator must review and revise as necessary all permits, <br />leaseholds, and other documents. Review by the Division indicates <br />/ that the operator may need to update the MSHA permit, and reinstate <br />the groundwater augmentation plan <br />~/ c. All exhibits and accessory documents (Volume 4) should be updated <br />and reflect the approved dry mine plan (i. e. Section 8). <br />V. Bond <br />~~~~ Rule 3.0 <br />~,, ,v The Division has reviewed the bond document and the original bond calculations <br />u~ ~ on the test pit for CCMC. The bond forms require riders which add the <br />~~ ~~ language contained in Rules 3.02.4(2)(b)(v)(A&B) (for corporate sureties) and <br />3.02.4(2)(d)(vi)(A8B) (for letters of credit) in order to be in compliance. <br />This language is enclosed. Kaiser Corporation must contact the bonding <br />companies and submit the appropriate riders to the Division by <br />October 30, 1986. <br />Review of the bond calculations for the test pit, submitted January 11, 1983, <br />indicates that bonding was calculated for the pit area only. However, costs <br />for reclaiming the existing facilities area, drainage control systems, etc., <br />must also be included. The Division has recalculated the bond necessary for <br />the test pit, and has found that a total of E432,666.44 is required. These <br />costs may be broken down as follows: <br />Backfilling Pit 5258,250.00 <br />Ripping, Coal Removal 4,606.00 <br />Grading 8,896.37 <br />Top soiling 50,238.00 <br />Sediment Control Removal 10,572.99 <br />Well Sealing 5,866.92 <br />Revegetation 16,730.00 <br />Mobilization 6,080.52 <br />' <br /> 9 <br />f <br />Indirect Costs 71,425.52 <br />TOTAL 432,666.44 <br />