My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51249
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:39 PM
Creation date
11/23/2007 6:38:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
8/2/1990
Doc Name
Bid invitation - East Mine Reclaim
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. PROJECT WORK SPECIFICATIONS <br />1.0 MOBILIZATION/DEMOBILIZATION <br />1.1 Description <br />This specification covers the CONTRACTOR'S operations for: <br />a. Payment of premiums for bonds and insurance acquired specifically <br />for the construction of this project, including premiums for <br />performance and payment bonds; <br />b. Movement of personnel, equipment, operation supplies, and <br />incidentals to the project site, but not within the work limit area; <br />c. Preparatory work at the construction site; <br />d. Demobilization of CONTRACTOR'S equipment and all other facilities, <br />final project clean-up, and for all other work for which payment is <br />not otherwise provided for under the contract. <br />The temporary works and construction plant may include, but not be limited to <br />the following: <br />a. Workshops, offices, storage yards, and construction plant and <br />equipment including spare parts, fuels, and oil; <br />b. Sanitation facilities, communication facilities, and sprinkler <br />trucks; <br />c. CONTRACTOR'S electrical power system; <br />d. Other items such as water, compressed air, etc., not specifically <br />listed but required for the functioning of construction activities. <br />1.2 Execution <br />Mobilization <br />Upon receipt of the Notice to Proceed, the CONTRACTOR shall furnish, mobilize, <br />move in, and install such temporary works, equipment and construction plant as <br />are necessary for the successful completion of the work. The CONTRAC70R shall <br />also operate and maintain such temporary works, equipment and construction <br />plant throughout the period of construction. All applicable temporary works, <br />such as sanitation facilities shall fully comply with any rules and <br />regulations. <br />Clearing and grubbing operations necessary for the temporary works, if any, <br />shall also be included as mobilization. <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.