My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51249
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:39 PM
Creation date
11/23/2007 6:38:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
8/2/1990
Doc Name
Bid invitation - East Mine Reclaim
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demobilization <br />Upon completion of the work under this Contract, the CONTRACTOR shall remove <br />all temporary works, equipment and construction plant. The CONTRACTOR shall <br />remove from the work site all rubbish, unused materials, and shall fill and <br />dress all holes and cavities made for convenience, and leave all areas in good <br />order and condition, subject to the approval of the PROJECT MANAGER. <br />1.3 Measurement and Payment <br />No measurement for payment shall be made for mobilization and demobilization. <br />Payment of two-thirds of the lump sum price bid will be made with the first <br />monthly progress payment after completion of the work described above for <br />mobilization. Payment of one-third of the lump sum price bid will be made <br />with the final progress payment for the work if demobilization has been <br />completed. If the price bid for mobilization and demobilization is greater <br />than 15 percent (15%) of the total contract price, invoices supporting the <br />mobilization costs will be required before payment is approved. <br />Remobilization <br />If remobilization becomes necessary due to seasonal conditions beyond the <br />CONTRACTOR'S control, remobilization costs will be paid based on documented <br />actual costs. No remobilization payment will be made if delays necessitating <br />remobilization were the CONTRACTOR'S responsibility. <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.