Laserfiche WebLink
Stipulation No. 9 <br />THE PERMITTEE MUST SUBMIT TO THE DIVISION, TO BE INCORPORATED INTO THE PERMIT <br />APPLICATION, A PLAN FOR POND MAINTENANCE AND CLEAN OUT SO THAT THE POND WILL <br />HAVE ADEQUATE VOLUME FOR STORAGE OF THE 10 YEAR - 24 HOUR STORM. THIS <br />INFORMATION MUST BE SUBMITTED 30 DAYS OF PERMIT ISSUANCE. <br />Resolution: CYCC submitted a pond maintenance plan on December 20, 1984. <br />Stipulation No. 10 <br />BECAUSE THE RETENTION OF WATER IN THE DETENTION BASINS WILL EXCEED 2 AC-FT, <br />THE PERMITTEE MUST CONTACT THE STATE WATER COURT TO FILE AN AUGMENTATION PLAN <br />SHOULD THIS WATER BE NEEDED. THE PERMITTEE SHALL PROVIDE THE DIVISION WITH A <br />COPY OF THE SUBMITTED AUGMENTATION PLAN WITHIN 60 DAYS OF PERMIT ISSUANCE. <br />Resolution: CYCC filed a Change of Water Right with the District Water Court <br />in Steamboat Springs during the week of March 18, 1985. Filing <br />for the water right partially abated NOV 85-011 issued on <br />February 6, 1985. (March 25, 1985). <br />Stipulation No. 11 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT TO THE DIVISION, <br />TO BE INCORPORATED INTO THE PERMIT DOCUMENT, A PLAN FOR RECLAMATION OF THE <br />ENERGY MINE N0. 3 AND MIDDLE CREEK DETENTION BASINS OR A PLAN FOR PERMANENT <br />STRUCTURES PER RULE 4.05.9. <br />Resolution: In response to NOV 85-011 CYCC claimed that this issue was <br />resolved in the permit. The Division requested that additional <br />information be submitted with respect to this issue in April, <br />1985. No evidence of additional information has been submitted <br />at this time, therefore, this issue has not been entirely <br />resolved. /t~s,/_~ Pay TTz,o3 (z-~z-8~~ ,~-~ ~~ Per...-,.f <br />Stipulation No. 12 <br />PRIOR TO ANY DISTURBANCE IN THE ENERGY MINE N0. 3 AREA, THE PERMITTEE MUST <br />SUBMIT TO THE DIVISION PROOF THAT THE ENERGY MINE NO. 3 DETENTION BASIN NPDES <br />DISCHARGE POINT HAS BEEN REACTIVATED. <br />Resolution: Proof of reactivation of the NPDES permit was submitted by CYCC <br />on October 5, 1984. <br />Stipulation No. 13 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT DESIGNS FOR <br />DITCHES F1, F2 AND F3 AND THE TWO 24 INCH CULVERTS ASSOCIATED WITH DITCH F2. <br />Resolution: Ditch and culvert designs were submitted by CYCC on December 20, <br />1984. <br />