Laserfiche WebLink
Stipulation No. 4 <br />INSTANTANEOUS STREAMFLOW MEASUREMENTS SHALL BE OBTAINED AND RECORDED 7HE <br />PERMITTEE AT THE SAME TIME THAT WATER QUALITY SAMPLES ARE COLLECTED AT SITE 29 <br />ON MIDDLE CREEK AT A MINIMUM DURING THE MONTHS FROM JUNE THROUGH OCTOBER. <br />THESE FLOW MEASUREMENTS SHALL BE INCLUDED IN THE PERMITTEE'S ANNUAL HYDROLOGIC <br />MONITORING REPORT. <br />Resolution: CYCC submits streamflow data from site 29 in the Annual <br />Hydrologic Report (10-20-84), <br />Stipulation No. 5 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST AMEND THE RECLAMATION <br />TIMETABLE UNDER RULE 2.05.4 OF THE PERMIT APPLICATION TO INCLUDE RECLAMATION <br />AND RESTORATION OF THE DISTURBED AREA ASSOCIATED WITH THE MIDDLE CREEK MINE <br />OFFICE COMPLEX. <br />Resolution: CYCC proposed to reclaim the Middle Creek office building in <br />2005 as a partial abatement of NOV 85-011 issued February 6, <br />1985. (March 19, 1985). <br />Stipulation No. 6 <br />THE PERMITTEE SHALL SUBMIT THE DESIGN FOR THE HAUL ROAD DRAINAGE DITCHES AS A <br />TECHNICAL REVISION TO THE DIVISION FOR APPROVAL PRIOR TO CONSTRUCTION. <br />Resolution: Resolved by TR-O1, Drainage and Sediment Control Plan <br />September 16, 1986. <br />Stipulation No. 7 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE THE PERMITTEE MUST SUBMIT DESIGNS FOR THE <br />MIDDLE CREEK DETENTION BASIN ADEQUATE TO CONTAIN THE FLOWS FROM THE 10 YEAR - <br />24 HOUR STORM AND IN CONFORMANCE WITH RULE 4.05.6. APPROVAL OF THE DESIGN <br />MUST BE OBTAINED PRIOR TO CONSTRUCTION. <br />Resolution: CYCC submitted the design on December 20, 1984. <br />Stipulation No: 8 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE COLORADO YAMPA COAL COMPANY MUST SUBMIT TO <br />THE DIVISION, TO BE INCORPORATED INTO THE PERMIT APPLICATION, A PLAN FOR <br />DEWATERING THE DETENTION BASINS TO THE ELEVATION NECESSARY TO CONTAIN THE 10 <br />YEAR - 24 HOUR STORM. THIS PLAN SHOULD INCLUDE THE RUNOFF CALCULATIONS FOR <br />THE STORM AND THE POND ELEVATION NECESSARY TO CONTAIN THIS RUNOFF WITHOUT <br />DISCHARGING THROUGH THE EMERGENCY SPILLWAY. SEDIMENT INFLOW NEEDS TO BE <br />CONSIDERED IN THIS CALCULATION. <br />Resolution: CYCC submitted a dewatering plan on December 20, 1984. <br />