Laserfiche WebLink
l <br />Stipulation No. 14 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE THE PERMITTEE SHALL INCORPORATE INTO THE <br />PERMIT DOCUMENT A DISCUSSION OF THE EXISTING STOCK WATERING POND. (THIS <br />DISCUSSION SHOULD INCLUDE THE SIZE OF THE POND, DESIGN AND CONSTRUCTION DATA, <br />CONSTRUCTION DATE). <br />Resolution: Ditch and culvert designs were submitted by CYCC on December 20, <br />1984. <br />Stipulation No. 15 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE THE PERMITTEE SHALL PROVIDE THE DIVISION, TO <br />BE INCORPORATED INTO THE PERMIT DOCUMENT, A PLAN FOR CONTROLLING SEDIMENT FROM <br />THE DISTURBED AREA ABOVE THE HOMESTEAD IRRIGATION DITCH. <br />Resolution: The requested discussion was submitted by CYCC on December 20, <br />1984. <br />Stipulation No. 16 <br />WITHIN 90 DAYS OF PERMIT ISSUANCE COLORADO YAMPA COAL COMPANY SHALL PROVIDE <br />DOCUMENTATION OF THE ROUTT COUNTY COMMISSIONERS DECISION REGARDING THE <br />PERMANENT RELOCATION OF COUNTY ROAD 179, OR PROVIDE A RECLAMATION PLAN FOR THE <br />ROAD. <br />Resolution: The requested discussion was submitted by CYCC on December 20, <br />1984. <br />