Laserfiche WebLink
Zalkind, Zimpfer, Shelton -2- July 29, 1982 <br />Area IX - Davis Gut ch Dam Site <br />Now considering redesign and reconfiguration of Davis Gulch Dam. <br />Reclamation of site anticipated in 1989. <br />Coffer Dam intended to become permanent sediment control facility with <br />spillway, as required by State .Engineer's Office prior to spring, 1983. <br />Area X - Lower Davis Gulch <br />Dam material stockpile to be reclaimed to original configuration some- <br />time in 1984. <br />Topsoil stockpiles throughout.Davis Gulch also to be included in final <br />dam site reclamation in 1984. <br />Dust suppression planned for disturbed areas. <br />Water pipeline revegetation scheduled for fall, 1982. <br />Area XI - Fire Break Road <br />Dust suppression intended. <br />Reseeding and revegetation of 8 acres of cut and fill slopes scheduled <br />fall, 1982. <br />Area XI2 - Ridgetop and North Draw Topsoil Piles (Pile) <br />Topsoil pile intended to be graded and finally reseeded fall, 1982. <br />Area XIII - West Road (Along Ri dge top, Western Project Boundary) <br />Dust suppression to be utilized throughout road length. <br />Revegetation of 8 acres of cut and fill slopes intended fall, 1982. <br />Rrea XZV - South Draw Topsoil Stockpile <br />Revegetation of damaged areas previously revegetated scheduled for fall, 1982. <br />Area XV - South Draw <br />Reseeding of upper access road scheduled fall, 2982. <br />Regrading of lower dam core material areas intended for 1983, to allow <br />access to area to maintain site. <br />Area XVI - LaSalle Setdown Area <br />Dust suppression intended throughout area. <br />Improvement of access road scheduled for 1983 to allow easier maintenance <br />of area, <br />Area XVII - Coarse Ore Gulch <br />Stockpile areas intended to be dust suppressed. <br />17 acres adjoining stockpile area to be reseeded fall, 1982. <br />Reclamation of dam access roads to occur prior to 2984, <br />Surface conveyor disturbance to be reseeded fall, 1982. <br />Area XVIII - Plant Site (Total Area 228 Acres) <br />North and south valleys, ridgetop and tranformer substation areas a12 <br />included within plant site area, <br />AZZ areas intended for continuous dust suppression. <br />50 acres to be regraded in 1983 to improve accessibility for dust suppression. <br />