My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50768
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50768
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:19 PM
Creation date
11/23/2007 6:13:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980047
IBM Index Class Name
General Documents
Doc Date
7/29/1982
Doc Name
SUMMARY OF COLONY PROJECT MEETING TUESDAY JULY 27 1982
From
MLR
To
JOE ZALKIND JERRY ZIMPFER DAVE SHELTON JIM MCARDLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO RiC t,nRD D. LA MM. ~ovemm <br />DEPARTMENT OF NATURAL RESOUflCES <br />D. Monte Pascoe, Executive Director <br />MINED LAND RECLAMA'T'ION <br />423 Centennial Building, 1313 Sherman S[reet <br />Denver, Colorado 60203 Tel. (303) 866-3567 <br />1111111111111// j <br />David C. Shelton <br />TO: Joe Zalkind, Jerry <br />FROP9: Jim Pendleton <br />RE: Summary of <br />July 29, 1982 Director <br />mpfer, Dave Shelton, Jim McArdle <br />~~~ ~: <br />~oject Meeting, Tuesday, July 27; 1982 <br />The following is a summary of Exxon's preliminary reclamation plans for <br />various designated areas of the Colony Project. <br />Area I - Colorado River Potable Water Intake <br />Scheduled for reseeding fall of I982. <br />Area II - Terminal Area <br />18 acres scheduled for dust suppression, only. <br />78 acres scheduled for reseeding fall of 1982. <br />Area III - Access Road Terminal to Project Site <br />Revegetation of road cut and fill slopes and completion of grading <br />scheduled by fall, 1982. <br />Area IV - Ponds and Segment of Road from Site Entry to Construction Trailers <br />7 of 11 acres scheduled for revegetation fall of 1982. <br />Sediment control ponds to remain. <br />Area V - Road and Areas of OId Retort on Middle Creek Valley Floor Beloty <br />Mine Bench <br />Partial revegetation scheduled fall, 1982. <br />Road grading complete as of this date. <br />Rrea VI - Mine Bench <br />Crusher pit to remain open, as it now exists. <br />Remainder of bench in final configuration as of this date. <br />Area VII - Middle Fork, Including Dam Site <br />Redesign of dam being considered. <br />Preliminary concept is to complete dam in 1983 or 1989. <br />Dust suppression planned for area prior to completion of dam. <br />Area VZII - Middle Fork Dam Access Road <br />Road to be completed following dam completion in 1983 or 198A. <br />Dust suppression planned for roadway in the interim. <br />Revegetation of 6 acres of original, abandoned access road scheduled <br />fall, 1982. <br />
The URL can be used to link to this page
Your browser does not support the video tag.