Laserfiche WebLink
The following is a brief summary of all revisions received by the Division since Permit Renewal <br />03. <br />Technical Revision-52 was submitted on 23 May 2000, called complete on 23 May 2000 and <br />approved on 25 October 2000. This revision allowed for the construction of a new return air <br />shaft to the B Seam workings (RS #2), and associated light use road; and a new ventilation shaft <br />to the D Seam workings west mains (WMVS #1). <br />Technical Revision -53 was submitted on 16 January 200I, called complete on 26 January 2001 <br />and approved on 17 Apri12001. This revision was submitted in response to an order to revise the <br />permit issued by the Division. The revision includes map revisions to more accurately delineate <br />disturbance azea boundaries, and provides additional design documentation and demonstrations <br />for Small Area Sediment Control Exemptions (SAE`S). <br />Technical Revision -54 was submitted on 12 February 2001, called complete on 20 February <br />2001 and approved on 17 August 2001. This revision addresses detailed sediment control plans <br />and demonstrations for the East Portal Facilities' reclaimed configuration. A preliminary plan, <br />which was not approved, had been included in TR-51, but that plan was withdrawn. <br />Technical Revision -55 was submitted on 25 May 2001, called complete on 4 June 2001 and <br />approved on 20 July 2001. This revision provides additional map and narrative documentation <br />regarding non-coal waste, equipment and material storage facilities. The revision was submitted <br />to abate Notice of Violation CV-2001-010. <br />Technical Revision -56 was submitted on 22 August 2001 and subsequently withdrawn with the <br />submittal of Permit Revision 04. <br />Technical Revision -57 was submitted on 24 May 2002, called complete on 28 May 2002 and <br />approved on 8 July 2002. This revision allowed for the construction of an additional B-Seam <br />return air shaft (RS-3) and an associated light use road within the Deserado Mine pemut azea. <br />Technical Revision -58 was submitted on 12 August 2002, called complete on 16 August 2002 <br />and approved on 23 August 2003. This revision provided modified designs for permanent <br />ditches and specific design information for temporary "in pit" ditches at Refuse Area RP-Sa. <br />This revision was submitted to abate Notice ofViolation CV-2002-016. <br />Technical Revision -59 was submitted on 14 October 2003 and called complete on 27 Octocer <br />2003. This revision allowed for the use of trucks to haul coal to the loadout and for the <br />construction of a new rail caz loading system. This revision was withdrawn on 25 November <br />2003. <br />Technical Revision - 60 was submitted on 26 August 2004, called complete on I September <br />2004 and is still being considered by the Division. This revision was in response to Stipulation <br />--- -53. It addressed final designs for the refuse piles at the Deserado Mine. - - <br />14 <br />