My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50392
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50392
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:35:55 PM
Creation date
11/23/2007 5:55:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983058
IBM Index Class Name
General Documents
Doc Date
1/13/1993
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
use. Upgrade the design information from Rule 4.03.1 accordingly and submit a <br />schedule for construction and subsequent certification (Rule 1.04(111). <br />Ponds. Impoundments. Diversions -Rules 2.05.3 and 4.05 <br />16. The file on the resolution of Stipulation 12 is incomplete. Please indicate the pages <br />and drawings which were revised to satisfy this stipulation. <br />17. Provide design specifications for the outlet structures on the tipple area pond per <br />Rules 4.05.6(3) and 4.05.7 and in compliance with 2.05.3(4)(il and (ii). <br />18. Prepare ditch designs to route water off the upper tipple area access road (Rule <br />4.03.1(4) and include a schedule for installing the ditch. <br />19. Provide calculations proving adequate sizing for two culverts: 1) the 24-inch CMP <br />running from the east mine access road ditch into the lower bench pond; and 2) the <br />12-inch CMP running beneath the road below the scale at the Sales Office (Rule <br />4.03.2(4)). <br />Reclamation -Rule 2.05.4, 3.01 and 3.02 <br />20. Provide a topographic map showing the existing topography at the site, for use in <br />comparison with the post-mining topography map requested in Question 21. <br />21. Provide apost-mining topography map of the mine site area with contour lines, as <br />opposed to slope directions, per Rule 2.05.4(2)(c). <br />22. The letter from Mr. Louis Giuliano dated October 2, 1989 states he wants the shop <br />buildings left for his use. Which buildings are these and do these buildings include <br />the shop at the Sales Office? <br />23. Stipulation 5 required Twin Pines to submit a seed bed testing program and then to <br />test the seed bed. <br />a. Incorporate the plan specified by the January 28, 1985, MLRD <br />correspondence into the permit application to ensure successful <br />revegetation (Rules 2.05.4(2)(e)lvii) and 2.07.612)(b)). Include a <br />monitoring plan listing sampling intervals and sampling parameters. <br />b. Modify the bond to include the cost of performing this monitoring and <br />the implementation of a worst-case soil conditioning: discing <br />diammonium phosphate fertilizer into the top three inches of the <br />reclaim at the rate of 100#/acre. <br />c. Submit the results of the seed bed testing performed prior to the <br />portal excavation. <br />24. Please modify the revegetation plan to provide a commitment in the permit <br />application to consult with the Division about weed infestation problems and to <br />submit a schedule and plan in a minor revision immediately prior to implementing <br />specific control measures per Rule 2.05.4(2)(e)(v). <br />Twin Pines Mid-Term Review 4 January 13, 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.