Laserfiche WebLink
Backfillin0 and Grading -Rules 2.05.3161(bl, 2.05.3191, 2.05.4(211a1, 2.05.4(211c1, 4.09, <br />4.13, and 4.14 <br />25. Provide a rill and gully plan for reclaimed slopes showing compliance with 4.14.6. <br />Describe a monitoring plan, a method for assessing the degree of erosion, and a . <br />generic plan for gully repair. <br />Coal Processing Waste and Underground Development Waste -Rules 2.05.2. 2.05.3(11. <br />2.05.3(2). 2.05.3(31, 2.05.3(81. 4.01, 4.10 and 4.1 1 <br />26. Revise the statement on waste pile construction on page 84 to conform with Rule <br />4.10.4(3)(al which limits lift thicknesses to no more than 24 inches. <br />27. Please update the information about the north spoil area. Indicate how much <br />material has been stockpiled at the site and the volume of available storage volume <br />on page 84. <br />Sealing of Drill Holes and Underoround Ooenin0s- Rules 2.05.4(2)(01 and 4.07 <br />28. Document the sealing status of all holes drilled within the permit area for coal <br />exploration and water monitoring, with the exception of the holes drilled in 1991. <br />Prepare abandonment reports if appropriate per 2.02.6131(b) or 4.07.3(3?. If there <br />are open holes at the site, itemize their diameter, depth and aquifer status, and <br />modify the reclamation costs portion of the permit application (2.05.4(2)(b)1. <br />Subsidence -Rules 2.05.6(6) and 4.20 <br />29. Amine's permit area includes the affected area and undermined areas within the <br />angle-of-draw associated with subsidence (Rules 1.04(7) and 1.04(891). Please <br />estimate the angle-of-draw and delineate its surface expression on the General Mine <br />Plan (Drawing TP-2). Concurrently, update Drawing TP-2 to include the current <br />estimate of the mine plan and periods of mining. <br />30. Please provide evidence that landowners have been notified about the mining plan <br />and potential subsidence in accordance with Rule 4.20.2. Copies of the letter and <br />the green card certifying receipt would be satisfactory documentation. <br />Bonding -Rule 3 <br />31. The Division is re-calculating Colorado coal bonds to provide adequate monies to <br />reclaim the coal left in stockpiles. Establish a maximum coal storage volume at the <br />Sales Office and the mine site and incorporate those estimates into the permit <br />application. Provide a plan to store 50°~ of the maximum storage volume. Assess <br />the bond required to cover this material and incorporate it into Section 2.05.4. <br />32. The three pads at the tipple site still require bond for their removal. There are three <br />options available for reclamation: 11 destruction and removal of the pads offsite; <br />2) rubblization and burial with two feet of soil; and 3) burial in place with four feet <br />Twin Pines Mid-Term Review 5 January 13, 1993 <br />