Laserfiche WebLink
Complied with. <br />Stipulation #6 <br />The Division requires that the permittee complete an approvable detailed engineering plan for the <br />permanent phase B waste slurry embankment and submit the plan to the Division one yeaz prior <br />to the expiration date of this permit. The detailed plan shall be submitted as a permit revision. <br />Further, if 12000 tons of waste is produced prior to obtaining approval of the permanent waste <br />embankment, mining operations shall cease until an approval is obtained for permanent disposal <br />of additional waste. <br />Terminated. <br />Stipulation #7 <br />Prior to construction of the access road, the applicant must submit site specific design standards <br />for embankment stability, for Division approval. The analysis shall be conducted in <br />conformance with Rule 4.03.1(3)(D)(VII). The design standazds shall be submitted as a revision <br />to the permit application. <br />Complied with. <br />Stipulation #8 <br />The Division requires the pennittee, in the event that sinkhole subsidence collapse were <br />determined by the Division, to constitute a potential hazard to the public health and safety, to <br />implement appropriate sealing and backfilling of sinkhole collapse features. <br />Complied with. <br />Stipulation #9 <br />The Division requires that the permittee, in the event that any slope instability is determined by <br />the Division to have developed within the affected azea, to submit to the Division for review an <br />analysis of the causes and resultant hazards of any such instable slope area. Using this analysis, <br />the Division shall decide whether a hazazd is represented by any specific slope movement event <br />and whether a slope stabilization program should be developed and implemented. <br />Complied with. <br />Stipulation #10 <br />If the U.S. Bureau of Mines and the permittee have not agreed to a subsidence monitoring <br />program acceptable to the Division prior to completion of the rock tunnel, the Division will <br />require the permittee to amend the current subsidence monitoring program. Further, no mining <br />shall occur within the coal seam until the permittee has obtained approval from the Division for <br />the amended subsidence monitoring program. <br />Terminated 9/19/1989. <br />Stipulation #11 <br />The Division directs the permittee to prepare and submit a format for the required semi-annual <br />6 June 1, 2006 <br />