My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50193
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:32:53 PM
Creation date
11/23/2007 5:46:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977376
IBM Index Class Name
General Documents
Doc Name
NOTICE OF HEARING ON DEBTORS MOTION FOR AUTHORIZATION TO USE PROPERTY OF ESTATE OUTSIDE ORDINARY COU
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Earl E. Emery 10 June 19, 1991 <br />Remcor's focused business goal is to be responsive to our client's <br />needs and develop our business by repeatedly serving a limited <br />number of clients. This has been accomplished by providing a <br />valued service as measured in terms of high quality and equitable <br />pricing. Our particular strength lies in the ability to assess <br />the de;ree and extent of the problem, evaluate alternative solu- <br />tions, and work with our clients design and implement the required <br />solutions. <br />PROJECT ORGANIZATION <br />The key members of Remcor's project team have strong personal his- <br />tories of direct experience in waste ma:~acement. This experience <br />will improve the technical quality and practicability of Remcor's <br />analyses and recommendations. It will also increase the precision <br />and coxpleteness of our cost estimates. Also, members of our <br />prcject team have extensive experience in facility closures and <br />environmental affairs; experience that will increase the respon- <br />siveness and aapropriateness of our recommendations. Several team <br />members have recently completed landfill closure projects and have <br />working knowledge of the regulatory requirements. <br />The project team includes experienced professionals in geotechni- <br />cal and civil engineering, geohydrology, and regulatory affairs. <br />This miz will provide a well documented data analysis to support <br />the proposed remedial actions. The resulting project organization. <br />provides: <br />A senior corporate officer to supervise the overall project <br />and provide corporate resources as needed for its timely, <br />cost-effective completion. <br />~~ • An experienced project manager to assure continuity of ef- <br />fort, technical quality, cost and schedule control, and <br />client satisfaction throughout the project. <br />Professional and technical personnel with strong technical <br />backgrounds to fill other key positions in the project or- <br />ganization, provide quality control, and offer guidance in <br />construction and costs, steel industry operations, water <br />chemistry, and regulatory affairs. <br />PROJECT TEAM <br />Remcor's key project team members are described below in terms of <br />their specific project assignments and su=.caries of their quali- <br />fications that are applicable to each assignment. Resumes for the <br />key project team members identified in the project organization <br />are attached for your review. <br />~ •,y FF - <br />'RGL6TIC SOLLTIONS FOR NALRDOUS WASTE iRDILFIYS' <br />
The URL can be used to link to this page
Your browser does not support the video tag.