Laserfiche WebLink
Minor Revisions (MR): <br />MR-11 9/30/2004 <br />MR-12 9/1/2005 <br />MR-13 9/13/2005 <br />MR-14 10/31/2005 <br />Violations <br />Change of local contact <br />Changes in interests <br />Inclusion of new air emissions permit and <br />correction to mine identification signs <br />Edit of the Permit Application Package <br />No violations have been issued since the last permit renewal (RN-02). The last <br />enforcement action, CV-2000-008, was abated on October 13, 2000 (approximately five <br />years ago). <br />Permit Stipulations <br />Permit 1992-081 has only one active stipulation (ST), ST-7. A history of stipulations is <br />summarized in Table 4 below. <br />Table 4 -History of Stipulations <br />Stipulation Date Complied Description <br />Number With <br />1 3/11/1998 Resolution of Kentucky violation #88950 <br />2 7/22/1993 Designs for culverts and ditches <br />3 7/22/1993 Changes to ground and surface water monitoring <br />4 12/16/1994 Verification of Kentucky violations <br />5 5/23/1997 Addition of culvert RRC-15 <br />6 5/14/2004 Resolution of Kentucky bond forfeiture/violation <br />7 Future Right of entry for use of Seneca II-W Tie-across <br /> haulroad2 <br />8 8/29/2005 Inclusion of new air-emissions permit for coal load- <br /> in (loadin) operations <br />The permit is in temporary cessation. Stipulation 7 requires right of entry prior to the <br />haulage of coal across a (private) road. <br />$ond <br />The current estimated cost of reclamation of the HG Loadout permit azea is $1,079,161. <br />This reclamation cost estimate was developed by the Division for Technical Revision <br />z Operations of the approved coal loadin facility include the proposed use of a haul road currently included <br />in the Seneca Coal Company Seneca II-W mine permit number C1982-057. <br />Hayden Gulch Loadout Midterm Review Page 5 November 8, 2005 <br />