Laserfiche WebLink
Item 15. Rule 2.05.3(3)(c)(vii). No certified profile was found for haul road HGLF-HRI. <br />Please add a certified profile to the PAP. <br />Item 16. Rule 2.05.3(3)(c)(vii). No certified profile or cross sections were found for the <br />access road. The only plan view of the access road is on Drawing 12-1 and Drawing I2-2. <br />Please clarify as suggested above. <br />Item 17. Rule 2.05.4(1). Please add to the areas disturbed with the water supply well <br />and the water line on Exhibit 17-1. <br />Item 18. Rule 2.05.4(1). There aze four shallow monitoring wells, and one water supply <br />well to be reclaimed. Please revise the description of the hydrologic reclamation plan <br />(page 1 of Tab 16) accordingly. <br />Item 19. Rule 2.05.4(1). No description of the reclamation of the water supply line was <br />found in the permit (page 3 of Tab 17). Please include a description of the plan for <br />reclamation of the water supply line. <br />Item 20. Rule 2.05.4(2)(b). The reconciled reclamation cost estimate of RN-02 at Tab 23- <br />1 needs to be replaced by the estimate of TR-06. Please update the PAP to reflect the <br />current (TR-6) cost estimate. <br />Item 21. Rule 2.05.5(1)(b). No comments concerning the proposed post-mining land use <br />by the legal or equitable owner of record of the surface of the proposed permit azea were <br />located in the PAP. Please include such comments in the PAP. <br />Item 22. Rule 2.05.5(1)(c). The reclamation plan needs to include apost-mining land use <br />map. Exhibit 4-1 might be used, but a reference to it needs to be included in the PAP. <br />Please include a reference to Exhibit 4-1 if it is to be used as the post-mining land <br />use map. <br />Item 23. Rule 2.05.6(3)(b)(iv), There is a comprehensive discussion of ground water <br />monitoring in the PAP; however, the text does not address, specifically, point(s) of <br />compliance. The Division will use water quality data from HGDAL4 monitoring [to <br />begin in 2005 (page 10 of Tab 13) of the PAP] along with water quality data from <br />HGDAL3 monitoring to advance this requirement. See Division letter of August 13, <br />2001, Re: Ground Water Points of Compliance. No response is required to this item at <br />this time. <br />Hayden Gulch Loadout Midterm Review Page 9 November 8, 2005 <br />