My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL49742
DRMS
>
Back File Migration
>
General Documents
>
GENERAL49742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:29:20 PM
Creation date
11/23/2007 5:22:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980002
IBM Index Class Name
General Documents
Doc Name
BID
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4 REVEGETATION <br />Revegetation procedures will be performed after September 20, 1996. The awarded <br />CONTRACTOR will notify the PROJECT MANAGER 2 (two) weeks in advance of his notice <br />to proceed with the revegetation phase of the project. The OWNER will supply all the <br />seed for the reseeding. The CONTRACTOR will supply the fertilizer, mulch, equipment for <br />chiseling or other approved technique for seedbed preparation, fertilizer application, <br />seeding, mulching, and crimping. Earthmoving activities related to recontouring and <br />backfilling are estimated to disturb approximately 6 acres which will require revegetation. <br />All areas disturbed and/or compacted during reclamation work, backfills and any other <br />areas specified in these Special Conditions will be revegetated according to the <br />Revegetation Specifications (20.0) in the General Bid Specifications. Either commercial <br />fertilizer or manure may be used for this project. Seed will be supplied by the OWNER. <br />CONTRACTOR must supply fertilizer content tags and fertilizer and mulch weight tickets. <br />Measurement and Payment <br />Payment for this task will be reflected in a lump sum bid under Item 4 on the Bid Schedule. <br />This lump sum bid will cover payment of all costs for seedbed preparation, fertilizing <br />(including supplying fertilizer), seeding, mulching (including supplying mulch), and mulch <br />crimping. These revegetation procedures will be performed on all regraded, backfilled and <br />otherwise disturbed areas from project work. There will be no measurement for payment. <br />Payment shall be as this task is completed and approved by the PROJECT MANAGER. <br />Payment for this task shall be made only for that amount shown under Item 4 of the Bid <br />Schedule. Any or all incidental costs incurred by the CONTRACTOR shall be reflected in <br />each Bid Item or shall be paid at the CONTRACTOR's expense. <br />TASK 5 EQUIPMENT RENTAL <br />The previously backfilled portals require excavation to confirm the placement of bulkhead <br />seals and to further strengthen the failing backfills. This procedure will be required before <br />any regrading work is to be performed in the portal vicinity as directed by the PROJECT <br />MANAGER. The machine for this bid item is a medium-sized hydraulic excavator with a <br />minimum 25' reach and having a minimum 30" size bucket. Any additional machine work <br />which may arise but is not covered under another task will also be covered under this task: <br />Measurement and Payment <br />Payment for this task will be reflected under Item 5 of the Bid Schedule as an hourly rate <br />for a Hydraulic Excavator machine with a minimum 25' reach and 30" bucket size with <br />operator. Bid hourly rate shall reflect the CONTRACTORS estimate for equipment and <br />personnel costs per hour to complete the task. Measurement will be actual hours required <br />to complete work outlined above and/or as directed and approved by the PROJECT <br />MANAGER. All of the hours outlined under Item 5 are NOT guaranteed. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.