Laserfiche WebLink
<br /> <br />Gald Hill Mill Adeaurcv Reviex Reaoone• Mav 2 1995 <br />To meet the requiremertG of the Division's February 28, 1995 inspection report, COM, Inc. will establish <br />additional 6ceboard on the dam by adding a compacted berm two feet ktigh and three feet wide az the nest. <br />The been will be placed on the outer edge of [he teifings dam end wheel rolled rn contpected with e <br />sheepsfoot type compactor to ensure that tiu Mrm will not leak. COM, lne is requnting that Ihr Coru fc"?t <br />normal lreeboard (three foot minuntrm freeboard) be waived untr! s new design Cor an eerthhll embenlancnt <br />is wmpleted The two Coot bean would allow one Coot of mwmum 6aboud dututg a design (100-vr, 24- <br />hr.) stator. COM, Inc would oat operate the mil{ and depoeit tadingf tin the pond until a new embatt{omnt <br />is designed, approved end m place. Dtuirtg this period, COM, Inc. would operate under a Notice of <br />Cessation, if approved. The decant lines will be checked and maintained m waking ordx. Work rnt the <br />berm will start ae soon ea there is enough snow olf the grotmd to allow ucesa to the site. <br />COM, Inc. is anticipating that the tailings will be used for brick manufactumtg. The bock company ha+ <br />agreed to use the tailings, however, the company has not yet completed siting fo[ a plant. A letter will be <br />sent ro the Oivtsion poor to any reuse of the tailings ot7site that will clearly state how the ddirtgs ere to be <br />used. <br />ti. Per your request, ltem ti of the LIMffED IMPACT (110) RECLAMATION FORM has barn corrected to <br />read'surface' <br />'r 'Rte direction to the nearest town has barn added Io the General Descnphan section (item 9) oC the <br />application. <br />8 All contact information (item 10) has been updated on the new application form. <br />9 Ircm I I on the epphcetion has bem changed from "Forestry" to "Wildlife Habi(at". <br />10. the mill building anA anallary perking will remain followvtg reclamation and the Reclamation Plan map will <br />be revised to show the mill btuldtng and ancilaryy parking u "lndrssttiaVCommuciel" land use. <br />t 1. Item 12 has bem chtutged to "Indtratnel/Comrrurcial' to reflect the past end present land use es mining <br />rethta then "Forestry" <br />l2. T1te white Cloud and Wynone dumps sill not be used a, borrow material for the tailings dam The <br />Wynona dump u presently the site for anal;ary Parkutg Cor the mill end Qte Wynone dump and Oscar <br />dtunp and ehaft area have been graded as pert of tht null construction. The 0.25 acres fisted an the Wynona <br />dump as pert of the reclamation area will be maintained for use as ancillary perking after reclamation. <br />The borrow area For material to raise the tailings dam and for a capillary burier on top of the tailings will <br />came from the area behind the ~6a dun that will be pert of the ullitnate pond area. The borrow area ties <br />already tied topsoil removed. If any additional topsoil has to be moved, a (ethnical revision letter stating the <br />area to have topsoil removed and the stockpile Brea IocaROn will be sent to Ute Drvrsron for appmval prier to <br />topsoil stripping. All material that is to be used N the tailutgs dam will be appropriately cktaracteriud (o[ <br />use. <br />13 A revised Exhibit A isvtcluded, and provides a legal description to the nearest qua[teryuarter section and <br />fecaunik oCe 1:2A000 scale U. S.G. S. map that shows the location of the millaite. <br />I a. The IOCatiOn of the Oscar shag u Aepicted on the Mining Plan map(s) but is not geld locatable trecnuse shrft <br />caved yrior to to81 end the shag location has been graded for mill construction. <br />