My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL49732
DRMS
>
Back File Migration
>
General Documents
>
GENERAL49732
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:29:19 PM
Creation date
11/23/2007 5:22:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
General Documents
Doc Date
5/2/1995
Doc Name
ADEQUACY REVIEW RESPONSE
From
COM INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Rrld Hell Mill Adwa uacv Rwviww Reannnaw M8,L2 1995 <br />The permit area boundary Cor the mill has bem redrawn to include the portion of the Forest Service road <br />between the mill buildutg and tnthrtgs pond m the permit area. The road will be stabilized to include wetcr <br />barn ea necessary ro ptevrnt erosion end the Gold Hill Mrs will grade the road when needed to maintain <br />access to Forest Service Bound end mitring claims in the area. The road evil] remain in a stabilized state <br />after reclamation as a permanent feature w maintain access to the azea below Ne mill. <br />'Rte Left Heed Creek pt¢ttp location is on land resod by COM, Inc The pump ie not v, a pump house and <br />u rued by the land ownu also. lire pump will remain in place !o be used by the land owner after Gold Hill <br />mill rerlarnaLOn. The ptpehne that lays on the Bound between the pump location and fhe Time Mine edit <br />creates no surface disturbance According Io your tenet of March 27, 1995, tf these ate no surface <br />distttrbences. the arcs does not have to be included in the permit area for the Cold Hill Mill. COAL, Inc u <br />not incltrdirtg the pipeline on the milt permit area but Ne pipelines route is shoRn on a map as requested in <br />Item 1. The Incatinn of the pipeline is on land controlled by r_OA1, Inc. or on land controlled by Ali Yids <br />with access rights under the mill contract to COM, lac. (see docwnentatron covered m Item 3 of the <br />Adequacy Review responses Gated below). <br />The Time Mine end Hazel A edits aze only used for water .storage underground and have no surface <br />disturbance associated with them. A pipeline from Lhe taiGttgs pond to the Haml A edit lays on the Bound <br />and creates no attrfece diattubence. The location of the pipeline is on land controlled by COM, Inc. or on <br />land controlled by Mi Vida with access nghta under the miD contrail to COM, Inc (see doctunmtatron <br />covered tit Item 3 of the Adequacy Review responses listed below). <br />The oily future disttrbance enticipeted at the Gold Hill Mill Is the expansion of the tailings dam and Ure <br />borrow area that is located above the tailings dam and ssnUtut the meximtun design area Cor the tailings <br />pond. Tht permit area will be revised on the rnapis) submitted and the final wvised acreage will be included <br />on a revised apphcaurni forth. <br />2. COM, Inc. is submit4ng maps that wrIl attempt to clarify prrnous contradictory maps submitted by tht <br />previous owner, Mi Vida. Ttte maps being submitted are a compilation of prcnoua maps end do not <br />include surveys of topsoil piles, product attxl~ilea, fmces, utility lines, monitor wells and othu items that <br />haves to be surveyed as requested in your Adequacy Review letter of March 2~, 1995. 'Ihe items to be <br />surveyed ire cturendy covered by three feet of snow sad cannot be accurately located on the Bound. <br />Locations of the Ti1ne Mine, Hard A edit and water pipelints are placed on the map consistmt with the <br />accuracy of the map upon which the Aems ere displayed. Aa noon az field conditions pemiit survey will be <br />made to accurately locate items within er vnmediately edj^cmt to rite mil] eras boundary. <br />3. Ownerstup, leases, end rigltbto•enter dociunmteoon will be submitted with this document <br />4. COM, [rec. currently h^a ^ eovrce of ore but the rn souse doe. not meet the tarrrre end oondiooru with <br />Hotilder County for a sorme ttom a contiguous property COM, inc. will sratsilize the site by adding a berm <br />to the tailiri~ pond that is m compliance with the permits. COM, [nc will then request s Notice of <br />Temporary Cessation trndu RWe 1.13. During L'ie cesseoon, the required site maintenance will continue <br />until a new ore source that meets the eonditiona with Boulder County is procured or the site wiU be <br />rccleimed et the expimtiim of the Notice of Cessation <br />ADDENDUM. COAT, Ines. mill u sited on two patmted taming claims which it does own m fee (n <br />edditrorl. COM, Inc. owru pan interest W the Wvnona end Who Do muting claims. COM, Inc also lies e <br />contract to mill ore prodtution Ban Mi Vida mines. All of these miriirtg prapecti.-s and milling contracts are <br />ore soureces for the Gold Hill Mill which hove bem approved by the Boulder County zoning department. <br />Therefore, any or all o(theae ore stnuces, utcludllt¢ odren to he acquired in the tLture, will Ix the wur~c of <br />ore far the Gold Hill MiB. <br />
The URL can be used to link to this page
Your browser does not support the video tag.