Laserfiche WebLink
~ ~ ~ ~ ~ ~ ~ t• ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />TABLE 2-9 <br />IMPACT SUMMARY <br /> ;;. <br />Einpnsed Action <br />Atceleratrd t)eve4apreeat <br /> <br />Typeo(RoteeHal:tm ectb ::Resource':;':. <br />P...:..Y .:.......:.:..:::: <br />..................... ;::: <br />:.:::::Picca.nce5.ite ...:... ....:: t!Ipelirie':::;; :: :.'::::P.erat:ttute:Sitc:-. <br />:::::.................... .......:... <br /> <br />.. ..... ................ <br />:,: .: :.Piceance:5i(e:;::::; :•:::..:;.'.:'::Pipeiino.'.;.::..:;:,;.;::.::::;: arai yte te.;;;:;.: <br />........... . <br />. ......... ..:...:... ::.::Trans ortitton:::::: :::.:: .: .:.::::..:::::.::::::::::;:::::::.:::::;::.:::.:' <br />P. <br />.:.:............................ . <br />• Transportation During construction, During construction, During construction, During construction, During construction, During construction, <br /> 110 trips per day an average of 100 130 (rips per day 215 trips per day an average of 100 an additional 250 trips <br /> would be genemted. trips and 10 trucks per would be generated. would be generated. trips and 10 trucks per per day would be <br /> In addition, there day would not create In addition, there In addition, Iherc day would not create generated. In <br /> would be 33 truck signi titan( traffic would be 66 truck would be 66 truck significant traffic addition, there would <br /> deliveries per day. impacts. deliveries per day. deliveries per day. impacts. be 132 truck deliveries <br /> This combatted This combined 'this combined per day. Volume <br /> increase would not <br />Accident increases increase would not increase would not <br />Accident increases increases are not <br /> change the Level of change the Level of change the Level of enough to decrease <br /> Service (I.OS) for any due to construction are Service (LOS) for Service (LOS) (or any due to construction are I.OS to unacceptable <br /> <br />road. included in Piceance <br />any road. <br />road. included in Piceance <br />levels. <br /> Site total. Site total. <br /> Accidents due to Accident increases Accidents due to Accident increases <br /> construction activities due to construction construction activities due to construction <br /> would increase by 9 Accident increases activities are included would increase by Accident increases activities arc included <br /> per year within the due to operations are in Piceance Site total. 14.7 per year within due to operations arc in the Piceance Site <br /> entire Pro eel Area. <br />J included in Piceance <br />During operations, an the entire Pro act <br />~ included in Piceance total. <br /> During operations, an Site total. additional 60 Area. Site total. During operations, an <br /> additional 50 commuter and 36 During operations, an additional I I S <br /> commuter and 14 trick trips per day are additional 1 I S commulcr and 44 <br /> buck trips per day are expected. Roadway commulcr and IS (ruck trips per day are <br /> expected. Roadway LOS would not be truck trips per day are expected. Roadway <br /> LOS would not be affected by this expected. Roadway LOS would not be <br /> affected by this increase. LOS would not be affected by this <br /> increase. Accident increases affected by this increase. <br /> During operations, an due to operations are increase. Accident increases <br /> additional 2.7 included in Piceance During operations, an due to operations are <br /> accidents per year Site total. additional S.S included in the <br /> world be expected in accidents per year Piceance Sile total. <br /> the entire Project would be expected in <br /> Area. the entire Project <br /> Area. <br />Sheet 11 of 12 <br />