My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48916
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:26:34 PM
Creation date
11/23/2007 4:42:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
General Documents
Doc Date
11/13/2001
Doc Name
Proposed Decision & Findings of Compliance for SL4
From
Partial Phase I & Partial Phase II
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rules Regulations of the Colorado Mined Land Reclamation Boazd for Coal Mining, <br />2 CCR 407-2 <br />SL-04 See Application <br />USFS U. S. Forest Service <br />I. Procedures and Summary Of The Review Process <br />Bond releases are initiated by a permittee of a coal mine in the form of an application 25. The <br />application requires a number of actions of the permtttee, including public notice of submission of the <br />application. Upon receipt of an application, the Division reviews the application for completeness z6. <br />Subsequent to a determination that an application is complete, the Division conducts an on-site <br />inspection and evaluation of the reclaimed site 27. This inspection may occur within thirty days of the <br />application being found complete, weather permitting. Surface owners, Office of Surface Mining <br />(OSM), and other interested parties may participate in the inspection. The Division considers <br />information gained from the inspection, public and agency comments, previous inspections, <br />information presented in the application, and information within permit files, and develops a Findings <br />of Compliance document that summazizes the degree of compliance with the rules associated with the <br />release. Based on the Findings of Compliance, a Proposed Decision is issued 28. The Proposed <br />Decision is made available to the public and interested agencies for 30 days. If uncontested, the <br />proposed decision becomes final 29. if the proposed decision is to approve the bond release, bonds <br />held by the Division may be returned or reduced. If contested, a due process is engaged to determine <br />the fate of the application. <br />This bond release (SL-04) was initiated by Minrec, Inc. by submission of an application (Minrec, Inc., <br />North Thompson Creek Mines Request for Partial Bond Release Permit No. C-81-025) under a J. E. <br />Stover & Associates letter of July 12, 2001. It was received at the Division on July 16, 2001. The <br />Application was found incomplete on May 22, 2001. After deficiencies in the application were <br />corrected, the application was found complete on August 13, 2001. The Applicant had provided proof <br />of publication of a public notice regarding the application in the Glenwood Springs Post Independent. <br />The notice had been published on June 7, 14, 21 and 28, 2001. The Applicant had also notified <br />(Appendix 2 of this Findings Document) landowners within and adjacent to the mine permit azea and <br />other interested parties of the application for bond release so <br />The Division received six expressions of interest in response to notices by the Applicant. One 31 was <br />from Ms. Janet Buck, Town of Carbondale. Her interest was in the overall general reclamation of the <br />u Rule 3.03.2(1) <br />ze Rule 3.03.2(1)(d) <br />2' Rule 3.03.2(2) <br />38 Rule 3.03.2(5) <br />~9 Rules 3.03.2(3) and (5)(b) <br />3o Rule 3.03.20) <br />~~ Telephone call, July 17, 2001 <br />SL-04, C-81-025 <br />November 13, 2001 <br />Page 6 of 16 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.