Laserfiche WebLink
Status - In Compliance, Future Submittal <br />Resolution of this stipulation is due after closure of the coal <br />load-out. <br />STIPULATION NO. 5 <br />THE OPERATOR SHALL MONITOR THE WATER LEVELS MONTHLY IN THE THOMPSON <br />WELL WATER SOURCE BEGINNING 120 DAYS PRIOR TO PILLARING OR <br />SUBSIDING WITHIN 1500 FEET OF THE THOMPSON WELL. THE OPERATOR MAY <br />EITHER OBTAIN THE USE OF THE THOMPSON WELL FOR MONITORING OR DRILL <br />AN ADDITIONAL WELL COMPLETED IN THE SAME GEOLOGIC UNIT. <br />Status - Terminated <br />This well is no longer serviceable due to mining activities and <br />samples can not be obtained. <br />STIPULATION NO. 6 <br />THE APPLICANT WILL SUBMIT TO THE DIVISION AN ANNUAL REPORT OF' <br />INFLOWS, DISCHARGES AND CONSUMPTION OF WATER WITHIN THE MINE. THIS <br />REPORT IS TO INCLUDE A MINE WORKINGS MAP SHOWING THE LOCATION AND <br />QUANTITY OF INFLOWS: A TABLE KEYED TO THE MINE MAP WHZCH SHALL <br />CONTAIN THE SOURCE (i.e., FAULT, FRACTURES, ETC.), QUANTITY, <br />DURATION AND QUALITY (i.e., pH, ELECTRO-CONDUCTIVITY AND <br />TEMPERATURE) OF ALL INFLOWS: A TABLE CONTAINING RECORDS OF WATER <br />DISCHARGED FROM THE MINE, CONSUMED IN THE MINE AND IMPORTED FOR USE <br />WITHIN THE MINE: AND A DISCUSSION OF WATER BALANCE WITHIN THE MINE. <br />THE INFLOW STUDY IS TO BE DONE DURING THE SPRING OF EACH YEAR WITH <br />THE REPORT SUBMITTED BY JULY 1. <br />Status - Complied With-On going <br />On September 11, 1991, with the approval of Minor Revision 16, the <br />Division modified the due date of the inflow study to correspond <br />with the due date of the annual hydrology report. The due date was <br />modified to an annual submittal on August 1, with the addition of <br />Stipulation 18. The Division received an inflow report in 1992 and <br />1993 which was included in the operator's Annual Hydrology Report. <br />JSTIPULATION NO. 7 <br />THE APPLICANT SHALL SUBMIT A HYDROLOGIC MONITORING REPORT FOR THE <br />SOUTHFIELD MINE. THE MONITORING REPORT SHALL INCLUDE A SUMMARY AND <br />ANALYSIS OF DATA COLLECTED TO DATE, INCLUDING: 1) WATER USED IN <br />THE MINING OPERATION, 2) MINE WATER DISCHARGES TO RECEIVING STREAMS <br />(QUANTITY AND QUALITY), 3) MINE WATER INFLOWS (ANNUAL MINE INFLOW <br />STUDY), 4) STREAM FLOWS AND QUALITY, AND 5) IMPACTS TO THE QUALITY <br />AND QUANTITY OF BEDROCK AQUIFERS. THE MONITORING REPORT SHOULD <br />UPDATE THE STATEMENT OF PROBABLE HYDROLOGIC CONSEQUENCES AND <br />INCLUDE A DESCRIPTION OF MITIGATIVE MEASURES TAKEN TO MINIMIZE <br /> <br />3 <br />